Laserfiche WebLink
event that the applicant fails to comply with the provisions of this regulation. The <br />cash bond shall be returned, less City of North Olmsted administrative fees as <br />detailed in the City of North Olmsted Codified Ordinances, after all work required <br />by this regulation has been completed and final stabilization has been reached, all <br />as determined by the City Engineer. <br />B. A portion of bond (equivalent of cost to apply final stabilization) will be retained <br />until all areas disturbed by construction activity are permanently stabilized and a <br />Notice of Termination has been submitted to Ohio EPA. Where vegetative growth <br />is used to achieve permanent stabilization, the area shall comply with final <br />stabilization requirements of the Construction General Permit. <br />C. No project subject to this regulation shall commence without a SWP3 or <br />Abbreviated SWP3 approved by the City Engineer. <br />927.13 ENFORCEMENT <br />A. If the City of North Olmsted and/or the Cuyahoga SWCD determines that a <br />violation of the rules adopted under this code exist, the City of North Olmsted or <br />representative may issue an immediate stop work order if the violator failed to <br />obtain any federal, state, or local permit necessary for sediment and erosion <br />control, earth movement, clearing or cut and fill activity. <br />B. All development areas may be subject to external inspections by the City <br />Engineer and/or the Cuyahoga SWCD to ensure compliance with the approved <br />SWP3 or Abbreviated SWP3. <br />C. After each external inspection, the City Engineer and/or the Cuyahoga SWCD <br />shall prepare and distribute a status report to the applicant. <br />D. If an external inspection determines that operations are being conducted in <br />violation of the approved SWP3 or Abbreviated SWP3, the City Engineer and/or <br />the Cuyahoga SWCD may take action as detailed in Sections 927.13 and 927.14 <br />of this regulation. <br />E. Failure to maintain and repair erosion and sediment controls per the approved <br />SWP3 plan may result in the following escalation. The penalty is determined by <br />the total number of violations per site even if the violations are for different <br />BMPs. <br />(1) First Violation: The City Engineer will issue a Notice of Deficiency to the <br />owner or operator. All controls are to be repaired or maintained per the <br />SWP3 plan within three (3) days of the notification. If controls have not <br />been corrected after this time, the City Engineer may issue a Stop Work <br />Order for all activities until corrections have been made. <br />(2) Second Violation: The City Engineer may issue a formal Notice of <br />Violation which includes a $500 administrative fee against the SWP3 <br />14 <br />