My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-093 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2021
>
2021-093 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 4:25:37 PM
Creation date
2/18/2022 4:25:04 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2021-093
Legislation Date
1/18/2022
Year
2022
Legislation Title
New Chapter 928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A: CHAPTER 928 <br />b. Infiltrate at least 25 percent of the WQv. <br />C. Capture, treat and release 50 percent of the WQv. <br />2. When a combination of impervious area reduction and stormwater quality control <br />facilities are used, ensure a 25 percent net reduction of the site impervious area, <br />provide for treatment of at least 50 percent of the WQv, or a combination of the <br />two. <br />3. Where projects are a combination of new development and redevelopment, the <br />total water quality volume required to be treated shall be calculated by a weighted <br />average based on acreage, with the new development at 100 percent water quality <br />volume and redevelopment at 25% infiltration of the WQv or 50% treatment of <br />the WQv. <br />4. Where conditions prevent impervious area reduction or on-site stormwater <br />management for redevelopment projects, practical alternatives as detailed in <br />Section 928.10 may be approved by the City Engineer. <br />928.10 ALTERNATIVE ACTIONS <br />A. When the City of North Olmsted determines that site constraints compromise the intent <br />of this regulation, off-site alternatives may be used that result in an improvement of water <br />quality and a reduction of stormwater quantity. Such alternatives shall meet the following <br />standards: <br />Shall achieve the same level of stormwater quantity and quality control that would <br />be achieved by the on-site controls required under this regulation. <br />2. Implemented in the same Hydrologic Unit Code (HUC) 12 watershed unit as the <br />proposed development project. <br />The mitigation ratio of the water quality volume is 1.5 to 1 or the water quality <br />volume at the point of retrofit, whichever is greater. <br />4. An inspection and maintenance agreement as described in Chapter 928.08.D.10 is <br />established to ensure operations and treatment in perpetuity. <br />5. Obtain prior written approval from Ohio EPA. <br />B. Alternative actions may include, but are not limited to the following. All alternative <br />actions shall be approved by the City Engineer: <br />Fees, in an amount specified by the City of North Olmsted to be applied to <br />community -wide SCMs. <br />2. Implementation of off-site SCMs and/or the retrofit of an existing practice to <br />
The URL can be used to link to this page
Your browser does not support the video tag.