My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-093 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2021
>
2021-093 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 4:25:37 PM
Creation date
2/18/2022 4:25:04 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2021-093
Legislation Date
1/18/2022
Year
2022
Legislation Title
New Chapter 928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
stream processes that assimilate pollutants, attenuate flood flows and provide a <br />healthy water resource. <br />C. This regulation shall apply to all parcels used or being developed, either wholly or <br />partially, for new or relocated projects involving highways and roads; subdivisions or <br />larger common plans of development; industrial, commercial, institutional or residential <br />projects; building activities on farms; redevelopment activities; grading; and all other <br />uses that are not specifically exempted in Section 928.01. <br />D. Public entities, including the State of Ohio, Cuyahoga County and the City of North <br />Olmsted shall comply with this regulation for linear projects within public rights -of way <br />(e.g. roadway and sidewalk projects). <br />E. This regulation does not require a Comprehensive Stormwater Management Plan for <br />linear construction projects, such as pipeline or utility line installation, that do not result <br />in the installation of impervious surface as determined by the City Engineer or Ohio <br />EPA. Such projects must be designed to minimize the number of stream crossings and <br />the width of disturbance. Linear construction projects must comply with the requirements <br />of Chapter 927 Erosion and Sediment Control. <br />928.02 DEFINITIONS <br />The definitions contained in Ohio Environmental Protection Agency ("Ohio EPA")'s <br />Construction General Permit entitled "Authorization for Storm Water Discharges Associated <br />with Construction Activity under the National Pollutant Discharge Elimination System" and <br />Ohio EPA's Municipal Separate Storm Sewer (MS4) Permit entitled "Authorization for Small <br />Municipal Separate Storm Sewer Systems to Discharge Stormwater Under the National Pollutant <br />Discharge Elimination System" in effect at the time a permit is applied for under this chapter <br />shall apply to this chapter and the following definitions shall also apply: <br />A. ACRE: A measurement of area equaling 43,560 square feet. <br />B. AS -BUILT SURVEY: A survey shown on a plan or drawing prepared by a registered <br />Professional Surveyor indicating the actual dimensions, elevations, and locations of any <br />structures, underground utilities, swales, detention facilities, and sewage treatment <br />facilities after construction has been completed. <br />C. COMMUNITY: The City of North Olmsted, its designated representatives, boards, or <br />commissions. <br />D. COMPREHENSIVE STORMWATER MANAGEMENT PLAN: The written document <br />and plans meeting the requirements of this regulation that sets forth the plans, practices, <br />and SCMs to minimize stormwater runoff from a development area, to safely convey or <br />temporarily store and release post -development runoff at an allowable rate to minimize <br />flooding and stream bank erosion, and to protect or improve stormwater quality and <br />stream channels. <br />
The URL can be used to link to this page
Your browser does not support the video tag.