My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-070 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2022
>
2022-070 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 11:04:55 AM
Creation date
8/17/2022 10:25:06 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2022-070
Legislation Date
8/16/2022
Year
2022
Legislation Title
Osborn Engineering Great Northern Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OSBORN <br />_NGINEERING <br />P20220930.000 <br />EXHIBIT <br />June 74, 7077 <br />Max Upton, MPA I Director <br />City of North Olmsted <br />Department of Economic and Community Development <br />5200 Dover Center Road <br />North Olmsted, Ohio 44070 <br />Re: Bridge Aesthetics for COY -252-0434 (Great Northern Blvd.) over 1-480 <br />Proposal for Professional Engineering Services <br />Dear Mr. Uoern'. <br />Osborn Engineering appreciates the opportunity to offerthis proposal for professional engineersngservices <br />for the above referenced project. <br />It is our understanding that the City would!ike to enhance the aesthetics of the Great Northern Blvd. Bridge <br />over IN 480 Conceptual rentri developed by Apexx Architecture show a decorative fence wltn "North <br />Olmsted" lettering attached, standard reveals In the outside face of the parapet, and a spot light for <br />lettering. The existing light poles and fixtures are to be reused as Indicated in the bridge rehabilitation plans. <br />Osborn Engineering will provide professional engineering consulting, construction drawings, and any <br />required plans specifications for the above referenced project, A detailed scope of work Is as follows. <br />7. EON CF PTLJAi An STH El m Tri SAL M EN T PLAN <br />1.01 Coordinate with Apexx Architecture to finalize the conceptual renderings <br />10) All renderings and conceptual drawings will be prepared by Apexx Architecture. <br />103 Osborn will provide technical Input as needed to finalize the conceptual aesthetic treatment plan <br />and ensure compliance wlte ODOT design standards. <br />1.04 Osborn will review and evaluate feasible options to illuminate the North Olnsted lettering. <br />Options for illuminating the lettering include pole mounted spot luminaires, wall mounted <br />luminaires, or ingroundspot luminaires. <br />1.05 Preliminary design to determine feasibility or the nor- uniform fence height and sail' end panel. <br />1.06 The City will submit a formal request to ODOT to incorporate the aesthetic freetrner is on the <br />referenced bridge <br />1.01 Project Management <br />2- CONrRrJâť‘ ION PLANS <br />CLE L1DCSupe e 0, i02 C1, 01d.rn1 <br />:2168613020' www.osbomeng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.