Laserfiche WebLink
r0i <br />THIS PROPOSAL DOES NOT INCLUDE ANY OF THE FOLLOWING: <br />• Field Survey/Basernapping <br />• Subsurface Utility Location Work <br />• Geotechnical Engineering Investigations <br />• Asbestos and lead paint identification or abatement <br />• Bidding and Award Activities <br />• Construction Administration or Construction Inspection/Ohservatien, including but not limited to, <br />attendance at progress meetings, responding to contractor RFfs <br />• Shop Drawing Review <br />• Record/As-Built Drawings <br />Please note that these services can be provided for an additional fes <br />Sincerely, <br />OSBORN ENGINEERING <br />SmttVura, P.F., I FFD, AT <br />Executive Vice PresidentI Principal, Infrzstracture Group <br />Shelley M_ siwala, P.E. <br />Manager of Transportation I Project Manager <br />cc Pete DiFranco r. __.:. -1L) <br />Vile <br />