My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-120 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2022
>
2022-120 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 12:09:12 PM
Creation date
12/1/2022 12:07:54 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2022-120
Legislation Date
11/29/2022
Year
2022
Legislation Title
Recreation Center Contract with N.P. Masonry and Anthony Barber
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />PROJECT QUOTE / CONTRACT <br />N.P. MASONRY ANTHONY BARBER CONTRACTING <br />Nicholas Paparsa <br />Anthony C. Barber <br />17 Williams St. <br />18950 Eastwood Dr. <br />Bedford, Ohio 44146 <br />Chagrin Falls, Ohio 44023 <br />Cell k (216) 633-1511 <br />Cell 4 (440) 821-9152 <br />Nlekthebricklaverl989'a emaikcom <br />anthonybarber03@amall com <br />Date: November 02 - 2022 <br />To: Kevin Kearney <br />Phone: (440) 668-8812 Fax: (440) 777-5889 Email: <br />Project: North Olmsted Recreation Center. As requested work to be done the last week of December 2022 weather pemutong_ <br />Address: 26000 Lorain Rd <br />Project Description: Saw cut in one new finished opening in existing twelve inch fluted block wall 10 feet wide x 14 feet <br />tall - or -. Saw cutting inside to be done with water, outside cutting to be dry cut. Install temporary horizontal shoring <br />beafns approximately three root two inches on center. Saw cut inside and out. Demo masonry. Rebuild jambs. Install <br />vertical C channels, set beam and block in with cmu. At the end of work day drape poly tarp over opening. Broom clean up <br />debris into dumpster provided by others. As requested move inner most steel column bracing above new door height (2) <br />locations <br />Included: Weare suppling. <br />i Standard gray twelve inch hollow block. Gray mortar. Grout for new block jambs. <br />One vertical reinforcing bar in each of the two new block jambs. <br />One W8X24 Steel beam lintel with 3/8 inch x 11 inch bottom plate 10 feet long beam centered on plate both ways. <br />Overall length of beam twelve feet long. Allowing for one foot of bearing on each jamb. Beam to be painted in <br />primer. <br />Two 12 inch wide x 14 feet tall C channel, one for each new jamb. <br />r Four temporary horizontal needle shoring beams held up with eight shoring posts. <br />e Plastic tarp to cover new opening in wall at the end of days' work_ <br />Labor as described in project description... <br />Excluded: In quote- <br />. Engineering. Bonds, fees, permits. Security for new opening. <br />To be supplied by the city <br />i Grading of gravel in front of new opening to allow for driving of fork lift to set steel beam and channels. <br />Dumpster. Forklift. Security for new opening <br />Notes: <br />1. Bid is partially based on vertical grout in existing wall is no more them 2 foot 8 inches on center, if wall is grouted solid <br />Add $1,000.00 dollars to price. If addition grout is found in wall it will be priced accordingly but not exceed $1,000.00 <br />Project cost $ 23,500 00 Terns payment due in full 10 days after invoice. <br />Authorization to proceed by X Date <br />Or, of North Olmsted. <br />Nicholas Paparsa <br />Anthony Barber X <br />Anthony Barber Contracting. <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.