§ 9.4.1.1 Except for the specific express warranty provided by Section 9.4 of this Agreement, Contractor makes no <br />other warranties by this Agreement and disclaims any and all implied warranties including, but not limited to, any <br />warranties that the Project or its components are merchantable, habitable, or fit for the purposes intended by Owner. <br />§ 9.4.12 Notwithstanding anything to the contrary contained in this Section 9.4 or the Contract Documents, <br />Contractor's warranty under Section 9.4 shall not apply to any system or equipment which is separately warranted by <br />written warranty to the Owner by a manufacturer, supplier or Subcontractor ofmy tier. Owner understands and agrees <br />that Owner's remedy for any shortfall of Guaranteed Savings attributable to a system or equipment separately <br />warranted by that manufacturer or supplier of Subcontractor is solely against that warrantor and not against Contractor <br />regardless of whether such warrantor actually reimburses Owner. <br />§ 9.4.1.3 Retro -commissioning is the process of refurbishing select equipment and systems to extend the useful life <br />and improve performance including cleaning, calibrating, minor repairs, parts replacement and general tune up of the <br />individual components and systems ("RCx"). Because RCx applies to existing used equipment, the warranty shall be <br />limited to the manufacturer's supplied warranty, if any, on replacement parts only, and no other warranty of parts, <br />components or labor is included. <br />§ 9.4.1.4 Contractor's warranty does not include routine maintenance, including, without limitation, equipment <br />cleaning, mechanical parts lubrication, testing, belt adjustment, or similar items. Owner may purchase those <br />maintenance services from Contractor by separate contract Contractor's warranty does not include damage caused <br />by voltage Fluctuations, blown fuses, misuse, refrigerants loss, lightning or other acts of nature. Work performed by <br />anyone other than the Contractor or Contractor's representative voids any warranty coverage. <br />§ 9.4.2 Guaranteed Savings <br />Subject to Contractor's right to correct under Sections 18.2 and 18.2.2 of this Contract (as limited by Sections 9.4.1 <br />and 18.2.1), Owner's sole remedy against Contractor for shortfall in the Guaranteed Savings shall be the applicable <br />annual payment under Attachment 2. <br />§ 9.5 Taxes <br />Owner warrants that the Contract is exempt from all sales, consumer, use, and other similar taxes <br />§ 9.6 Permits, Fees, Notices, and Compliance with Laws <br />§ 9.6.1 If required, the Contractor shall secure and pay for any permits, fees, licenses, and inspections by government <br />agencies necessary for proper execution and completion ofthe Work as part of the Contract Sum. <br />§ 9.6.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, <br />rules and regulations, and lawful orders of public authorities applicable to performance of the Work. <br />§ 9.7 intentionally omitted <br />§ 9.8 Contractor's Schedules <br />§ 9.8.1 The Contractor, promptly after being awarded the Contract, shall submit for the Owner's information a <br />Contractor's Schedule for the Work which shall become Exhibit B to this Contract. The schedule shall not exceed <br />time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the <br />conditions of the Work and Project, shall be related to the entire Project to the extent required by the Contract <br />Documents, and shall provide for expeditious and practicable execution of the Work. <br />§ 9.8.2 The Contractor shall perform the Work in general accordance with the most recent schedule submitted to the <br />Owner. Contractor shall not be obligated to meet interim or milestone dates set forth in Contractor's schedules other <br />than those specifically required by Section 2.3.2 of this Contract, if any ("Mandatory Milestones") and may be liable <br />only for Contractor's failure, as a result ofContractor-caused delays, to meet the agreed date of Substantial Completion <br />and Mandatory Milestones, if any, each as modified pursuant to the Contract Documents. <br />§ 9.9 Submittals <br />§ 9.9.1 The Contractor shall review for compliance with the Contract Documents and submit to the Owner the <br />Drawings and Submittals required by Attachment 1. By submitting Shop Drawings, Product Data, Samples, and <br />similar submittals, the Contractor represents to the Owner that the Contractor has (1) reviewed and approved them; <br />(2) determined and verified materials, field measurements, and field construction criteria related thereto, or will do so; <br />Page 7 of 18 <br />