My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-121 Ordinance
Document-Host
>
City North Olmsted
>
Minutes
>
2023
>
2023-121 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 10:42:46 AM
Creation date
9/19/2024 9:52:29 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2023-121
Legislation Date
9/17/2024
Year
2023
Legislation Title
Lorain Road Corridor Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing <br />• Alignment of intersection <br />creates safety issues <br />• Lack of visual buffers for <br />surface parking lots along <br />frontage <br />• Proximity to consolidated <br />elementary school site <br />• Proximity to Rocky River <br />Reservation <br />Option 1 <br />• High visibility crosswalks b <br />pedestrian safety features <br />6 extended crossing times <br />during school hours <br />• Multi -use path connecting <br />to Rocky River Reservation <br />and on north side of <br />Lorain Road <br />• Medians on approach of <br />Lorain Road <br />• Frontage standards (street <br />trees, green frontage) <br />• Reduction in curb cuts / <br />curb cut consolidation <br />Enhanced transit stops <br />and amenities <br />Option 2 <br />In addition to intermediate steps. <br />• Intersection realignment <br />- create 90 degree <br />Intersection <br />• Trailhead-themed transit <br />stop with connection to <br />Metroparks <br />• Creation of new <br />redevelopment sites <br />• Signal modification - leading <br />pedestrian interval <br />CITY OF NORTH OLMSTED I CITY ARCHITECTURE I WSP ss <br />
The URL can be used to link to this page
Your browser does not support the video tag.