Laserfiche WebLink
L_ <br />North Olmsted, Ohio July 23, 2025 <br />MCC 7500E Dispatch Console Position Add On Project <br />• Integration of other third party products, not defined in this statement of work, is not included in <br />this proposal. <br />• Ohio MARCS Zone Core site: <br />- Provide infrastructure related programming of the proposed dispatch operator position into <br />the Zone Core site, as applicable. <br />• Optimize equipment and verify that all equipment is operating properly and that all electrical and <br />signal levels are set accurately. <br />• Verify communication interfaces between devices for proper operation. <br />• Test features and functionality are in accordance with manufacturers' specifications. <br />• Verify the operational functionality and features of the operator position(s) supplied by Motorola, <br />as contracted. <br />• If any major task as contractually described fails, repeat that particular task after Motorola <br />determines that corrective action has been taken. <br />• Document issues that arise during the functional tests. <br />• Document the results of the acceptance tests and present to North Olmsted for review. <br />• Resolve any punchlist items before Final Acceptance. <br />d ltdesired, aseparate auote can.bepro <br />nnri <br />2.1.2 North Olmsted Responsibilities <br />ided upon request. <br />ne ex 5 ng room as the existing positions. <br />t.egti men, as needed. <br />The Customer will assume responsibility for the installation and performance of all other equipment and <br />work necessary for completion of this project that is not provided by Motorola. The Customer's general <br />responsibilities for the dispatch equipment is as follow: <br />• North Olmsted will provide a dedicated delivery point for receipt, inventory, and storage of <br />equipment prior to installation. <br />• Coordinate the activities of all North Olmsted vendors or other contractors, if applicable. <br />• Attend and participate in project meetings and reviews. <br />• Provide ongoing communication, as applicable, with Ohio MARCS regarding the dispatch <br />console project and schedule. <br />• Provide existing dispatch site equipment which will be interfaced to the proposed position. <br />• Provide FCC licensing, if required. <br />OTxE Antenna an�.linetlea�hts ale assumed to be <20 feet If greater than 20 any. FCC, licensing requirements' <br />�arthe reIt OEMsgstblltZyo tteCusti�4es, <br />• Ensure communications sites meet space, grounding, power, and connectivity requirements for <br />the installation of all equipment. <br />• Obtain all licensing, site access, or permitting required for project implementation. <br />• Secure site lease/ownership, zoning, permits, regulatory approvals, easements, power, and <br />Telco connections. <br />Statement of Work <br />Use or disclosure of this proposal is subject to the restrictions on the cover page. <br />Motorola Solutions Confidential Restricted <br />Page 7 <br />® MOTOROAA SOLUTIONS <br />