My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-069 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2025
>
2025-069 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 11:20:29 AM
Creation date
8/7/2025 12:37:03 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2025-069
Legislation Date
8/5/2025
Year
2025
Legislation Title
Purchase Motorola Dispatch Desk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
North Olmsted, Ohio <br />MCC 7500E Dispatch Console Position Add On Project <br />July 23, 2025 <br />• Provide third party products and interface if needed. <br />• Provide demarcation point located within 25 feet of the console interface. <br />• Provide certified electrician for anv electrical work required for the proposed installation. <br />• Provide clear and stable access to the sites for transporting electronics and other materials. <br />Sufficient site access must be available for trucks to deliver materials under their own power <br />and for personnel to move materials to the facility without assistance from special equipment. <br />• Supply adequately sized electrical service, backup power (UPS, generator, batteries, etc.) <br />including the installation of conduit, circuit breakers, outlets, etc., at each equipment location. <br />Provide AC power (dedicated 20 Amp AC outlets —simplex with ground) for each major piece of <br />equipment within six (6) feet of the location of the Motorola -supplied equipment, including the <br />associated electrical service and wiring (conduit, circuit breakers, etc.). <br />• Provide adequate HVAC, grounding, lighting, cable routing, and surge protection (also, among <br />existing and Motorola -provided equipment) based upon Motorola's "Standards and Guidelines <br />for Communication Sites" (R56). Ceiling [minimum nine (9) feet] and cable tray heights <br />[minimum eight (8) feet] in the equipment rooms in order to accommodate seven (7)-foot, six <br />(6)-inch equipment racks. <br />• Bring grounding system up to Motorola's "Standards and Guidelines for Communication Sites" <br />(R56) and supply a single point system ground, of five (5) ohms or less, to be used on all FNE <br />supplied under the Contract. Supply grounding tie point within 10 feet from the Motorola - <br />supplied equipment. <br />• Provide floor space and desk space (including desk furniture, as needed) for the system <br />equipment at the Customer -provided facilities. <br />• Relocate and/or removal of existing equipment, if needed, to provide required space for the <br />installation of Motorola -supplied equipment. <br />• Provide obstruction -free area for the cable run between the demarcation point and the <br />communications equipment, as well as between the backroom equipment room and dispatch <br />position(s). <br />• Supply interior building cable trays, raceways, conduits, and wire supports. <br />• Resolve any environmental issues including, but not limited to, asbestos, structural integrity of <br />the site, and any other building risks (resolve environmental or hazardous material issues). <br />• Provide console template and alias information as required for programming. <br />• Pay for usage costs of power and generator fueling, both during the construction and installation <br />effort, and on an ongoing basis. <br />• Any required system network link resources will be provided by Customer, per Motorola <br />specifications for consoles to connect to the Ohio MARCS Zone Core site. <br />2.2 Project Schedule <br />Motorola's preliminary schedule indicates total project implementation to be approximately 10-12 <br />months pending supply chain availability at time of purchase. This preliminary schedule is included for <br />informational purposes only and assumes that all Customer responsibilities as defined above are <br />completed, as required. If site improvements or site approvals are needed these must be completed <br />prior to equipment shipping to the field. <br />'I,-. Statement of Work ® M0700WOLA SOLUTIONS <br />Use or disclosure of this proposal is subject to the restrictions on the cover page. <br />Motorola Solutions Confidential Restricted <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.