My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-002 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2002
>
2002-002 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:02:49 PM
Creation date
12/30/2013 9:16:14 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2002-002
Legislation Date
1/4/2002
Year
2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF NORTH OLMSTED <br />RESOLUTION NO. 2002-02 <br />BY: MAYOR MUSIAL <br />A FINAL RESOLUTION APPROVING THE ESTIMATE BY THE <br />DIRECTOR OF THE OHIO DEPARTMENT OF TRANSPORTATION <br />(ODOT) OF THE CITY'S SHARE OF THE COST OF THE PAVEMENT <br />SURFACE TREATMENT IMPROVEMENT TO COL UMBIA ROAD <br />(STATE ROUTE 252) FR0M LORAIN ROAD TO THE NORTH <br />CORPORATION LINE, APPROPRIATING THE SUM OF <br />$29,564.00 FOR THE PROJECT, REQUESTING THAT THE DIRECTOR <br />OF ODOT PROCEED WITH THE IMPROVEMENT, AND AUTHORIZING <br />THE MAYOR TO ENTER INTD ANAGREEMENT WITH THE STATE OF <br />OHIO PROYIDING FOR THE PAYMENT OF THE CITY'S SHARE OF <br />THE COST OF THE IMPROVEMENT. <br />WHEREAS, on2l a; a°r -? " '' the City of North Olmsted, as the Legislative <br />Authority/Local Public Agency ("LPA") enacted legislation proposing cooperation with <br />the Director of Transportation for the following described project: <br />This project proposes to apply an edge-to-edge of pavement surface treatment to <br />Columbia Road (State Route 252) consistent with ODOT urban paving policy, <br />from Larain Road (State Route 10) to the North Corparation Line, lying within <br />the City of North Olmsted. This work is part of a larger project involving the <br />City of Westlake. The total work length of the project being approximately 1.87 <br />miles; and <br />WHEREAS, the LPA shall cooperate with the Director of Transportation in the <br />above described project as follows: <br />The City agrees to assume and bear one hundred percent (100%) of the entire <br />cost of the improvement, less the amount of State funds set aside by the Director <br />of Transportation for the financing of this improvement, and further, the City <br />agrees to assume and bear the entire cost as well as construction curb ramps <br />within the resurfacing limits of the project at intersections with curbs or other <br />barrier to entry. The curb ramps shall be constructed prior to the resurfacing <br />project. <br />ODOT shall provide one hundred percent (100%) of the funding for the <br />preliminary engineering of the project.
The URL can be used to link to this page
Your browser does not support the video tag.