Laserfiche WebLink
CITY OF NORTH OLMSTED <br />RESOLUTION N0. 81 - 30 <br />BY: Mk9 , SARINGER <br />A RESOLUTION DECLARING THE NECESSITY TO EXPEDITE THE <br />CONSTRUCTION OF RELOCATED S.R. 252 FROM THE SOUTH <br />CORPORATION LINE TO THE I-480 INTERCHANGE, AND <br />DECLARIN6 AN EMERGENCY. <br />WHEREAS, on May 20, 1969, the City of North Olmsted passed <br />Ordinance No. 69-123 whereby the City of North Olmsted agreed to cooperate with <br />a nd gave consent to the Director of the State of Ohio, Department of <br />Transportation for the construction and relocation of State Route 252, and <br />WHEREAS, ReSolution No. 77-43 was passed by City Council on April 5, <br />1977, urging the State of Ohio, Department of Highways, to expedite the <br />construction of Relocated S.R. 252 within the City of North Olmsted in order <br />to eliminate the haZardous conditions, and <br />WHEREAS, the culvert of existing State Route 252, Columbia Road, <br />located approximately 1200feet south of Butternut Ridge Road, originally <br />constructed in 1907, lengthened in 1909, in 1910, and again in 1924, has over <br />a period of many years been deteriorating to the point where the public is <br />endangered, and <br />WHEREAS, the condition of the east headwall, 8 feet by10.5feet, <br />reinforced concrete box culvert, as constructed in 1924, has deteriorated to <br />the point where the stability of the road embankment is jeopardized, and <br />IJHEREAS, on February 26, 1981, at approximately 4:00 p,m., S.R. 252 <br />was partially closed by restricting travel across the deteriorating culvert to <br />southbound traffic only, and <br />WHEREAS, travel across S.R. 252 over the culvert may have to be <br />totally closed as the culvert continues to deteriorate, and <br />WHEREAS, the existing culvert is proposed to be completely removed, <br />and a new longer culvert constructed in approximately the same location as <br />part of the relocation of S.R. 252, and <br />WHEREAS, canstruction plans, specifications and estimates of cost <br />have been essentially completed by the State of Ohio's consultant, <br />Alden E. Stilson 6 Associates, Ltd. <br />NOW, THEREfORE. BE IT RESOLVED THAT THE CITY OF NORTH OLMSTED <br />REQUESTS THE FQLLOWING: <br />SECTIOrI 1: That the State of Ohio advance the date of construction <br />for the re ocaT Lion of S.R. 252 from the City's south corporation line to the <br />1-480 interchange so that the public safety will not be jeopardized, and the <br />public will not be inconvenienced for a prolonged period of time. <br />SECTION 2: That the plans, which are essentially complete, be <br />reviewed an? approved, that right of way be purchased and that the contract <br />for construction be advertiseA and awarded without further delay.