Laserfiche WebLink
CITY OF NORTH OLMSTED <br />RESOLUTION NO. 2015 — 7 <br />By: Mayor Kennedy <br />A RESOLUTION AUTHORIZING THE MAYOR TO ENTER INTO A <br />CONTRACT WITH MARK HA YNES CONSTRUCTION INC. FOR <br />CONSTRUCTION SERVICES TO PERFORM THE SPRINGVALE <br />POND RENOVATION PROJECT, PURSUANT TO <br />SPECIFICATIONS ON FILE WITH THE CITY ENGINEER, AND <br />DECLARING AN EMERGENCY. <br />WHEREAS, the Springvale Pond Renovation Project will involve construction of a <br />new outlet control structure to provide the ability to lower the normal pond water elevation if <br />and when desired; and <br />WHEREAS, the project will involve removing sediment from the pond which <br />accumulates over time; and <br />WHEREAS, the Springvale Pond Renovation Project engineering estimate is less <br />than Fifty Thousand Dollars ($50,000.00) and is not legally required by the City Charter to be <br />competitively bid; and <br />WHEREAS, time is of the essence, as construction completion is desired by March 15, <br />2015 in preparation for typical spring rain and to avoid conflict with Golf Course operations; <br />and <br />WHEREAS, Mark Haynes Construction Inc. is experienced in projects such as this and <br />submitted a proposal in the amount of Forty Eight Thousand Dollars ($48,000); and <br />WHEREAS, it is the desire of this Council to authorize the Mayor to enter into a <br />contract with Mark Haynes Construction Inc. for the Springvale Pond Renovation Project. <br />NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY <br />OF NORTH OLMSTED, COUNTY OF CUYAHOGA, AND STATE OF OHIO: <br />SECTION 1: That the Mayor be and he is hereby authorized to enter into a contract <br />with Mark Haynes Construction Inc. for construction services for the Springvale Pond <br />Renovation Project. <br />SECTION 2: That this Resolution is hereby declared to be an emergency <br />measure immediately necessary for the preservation of the public health, safety and welfare <br />and for the further reason that it is necessary that this Resolution go into effect immediately <br />to ensure construction completion by the desired deadline of M a r c h 1 5 , 2015; and <br />