My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/1953 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1953
>
10/01/1953 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:01:21 AM
Creation date
7/17/2018 8:56:32 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
10/1/1953
Year
1953
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;,~. <br />j; <br />;~ ~.. <br />.ia. <br />:~ <br />Minutes of the Regular. Meeting <br />October 1, 1953 <br />• The Council met in special meeting, pursuant to due notice, on <br />Thursday, October 1, 19539-at 8:00 P. M. at the Village Ha].1, Mayor Gustav <br />Swanson presiding. <br />Roll Call: Present m Messrs Waltz, Sloan, Endress, Scheuring, <br />- ~ - Oatess and Cass© <br />Absent • ®- None. <br />Mr. Hecker, appearing on behalf of F. A. Pease Engineering Company', <br />suggested we put in some sort of good temporary'-road on Bonnieview, in view <br />of the fact that thsre will undoubtedly be some bad weather before the water <br />main is in. This will. make the road passable9 and after .completion of the <br />water main, the construction- company will have to leave the x~ad in as good <br />condition as when the j®b was started. The county, perhaps, may furnish <br />some of the slag at this time. . <br />B~.ds for the water mains in SOM Center Road Sece_#3, and '~Vorton <br />Park Drive were received from F. A. Pease Engineering. Company, and read by <br />the Mayor. . <br />The following. bids for a.12te cast iron water main in SOM Road <br />were received: - <br />Joe Adams Sewer & Water Co•. ~18~228.00 <br />Fred Haddad 19,9l.~1..00 <br />B. Fatol Construction Company 219116.00 <br />Angelo Marra Const. Co. 26,895.00 <br />The Utilities Const...Go. • 29,575.20 <br />Engineers Estimate of cost 4/20/53 X23,110.00 <br />• Allowance for Engineering, etc. ~~ 2,390.'00 <br />- Total Cost , 00.00 <br />The following bids for an 8" east iron water main in Worton Park <br />Drive wei°e received: <br />Fred Haddad X11,393.00 <br />- B. Fatol Construction Co, 11,740.00 <br />Ae Marra Construction Co. - 14,065.00 <br />_ ~ The Utilities Construction Co. 15,607®00 <br />Joe Adams Sewer ~c Water Coe 15,677.75... <br />Engineers Estimate. of Cost 6/5/53 X10,897.50 <br />Allowance for Engineering, etas ~ 11 102.50 <br />Total Cost 1.2,000000 <br />F, A. :Pease Engineering. Company. does not have a.fi nancial.or <br />equipment statement from Joe ..Adams Sewer & Water Co®, the lour biddex° on SOM <br />Road. The other compana.es file their. statements every.year9 as they bid on <br />jobs very often. <br />1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.