Laserfiche WebLink
periedic iaspectien at the si~e as deemed necessary ~y the <br />ENGINEER, verify resmlts of tests and issue progress report. <br />Admimistratien ef the business end ef the-¢emtract, such as <br />checking the percentage ef work completed, auditimg contract- <br />or's monthly requisitions, amd issming certificates for paymemt, <br />obtaining affidavits and lien waivers, checking insmranee cover- <br />age, preparing and fellewimgthreugh change orders and checking <br />cost ef credits involved, fimal inspection amd issuimg certifi- <br />cate ef completion before final paymemt. <br /> <br />(The general supervisiem ef the ENGINEER is te be distimgmished <br />from and does net include resident persemal supervisienas here- <br />imafter mentiemed). <br /> <br />SECTiOn,, 2. <br />~eet with d~ly authorized officials ef the CITY when requested <br />er necessary for cemsmltatien er conferences. <br /> <br />SECTION 4. <br />~ke field surveys, prier t, censtructiem, as required te s~p- <br />plememt smeh data as are available te determine leca~iens amd <br />elevations ef existing and proposed structures. <br /> <br />~ECT~©N ~. <br />~n~sh five (~) copies ef reports, plans (Bm paper), and spec- <br />ifications, amd-famish additional copies te the CITY at net <br />CeS~. <br /> <br />SEOTION 6. <br />Supervise all test borings, sub-surface explorations, sewage <br />flew measurements er ether investigations required for the <br />de~ermiming ef foundatiem eemditiems for the s~rmctures er the <br />capacities ef sanitary sewage ~versien strm¢~res. (The cost <br />ef smch borings, tests, expleratiems er investigations are te <br />be paid for by the CITY). <br /> <br />SECTION 7. <br />S~pervise the work ef imspectiem bureaus amd laboratories in the <br />imspectiem amd tests el materials emtering into the cemstructiem <br />ef strmetures, receive amd pass mpem, by approval er rejection, <br />all reports by sash laboratories er bmreams en the materials <br />tested for mse im the strmct~res. (The cost ef all smeh tests <br />amd inspectiem by laboratories er bureams are te be paid by ~he <br />¢~TY). <br /> <br />SECTION 8. <br />Prepare all necessary plans and appticatiens for permits for the <br />submission te amd apprevai ef iecal, state, and federal amth- <br />critics (such as mmaicipal bmildimg departmemts, State Beard ef <br />Health, etc.), as may be re,mired for the imitiatiem, presecu- <br />tiem amd censtruc~iem of the improvement. (The ~ests ef sash <br />permits are to be paid by the CITY). <br /> <br />~TICLE III r:,,PA~I~ENT FOR BASIC ENGINEERING SERVICE <br /> <br />SECTION1. <br />It is mutmally agreed by the parties hereto ~at payment te the <br />ENGINEER as compensation for Basic Emgineering Service shall be <br />based en the "Cost ef Construction# ef the project as designated <br />in Article I,.Sec~ien i ef this agreememt. Said "Cost ef Con- <br />strue%ion" shall include all materials, labor andmse ef equip- <br />ment amd without deductions om account ef pemalties, liquidated <br />damages er ether amemmts withheld from payments ~e contractors. <br />However, such "Cost of ~enstructien" shall net include the <br />ENGINEER'S fee.er ether payments te~he ENGINEER mn~er this agree- <br />ment. The "Ces$ ef Cemstructien" does net include the cost ef <br />land, right-el-way, cempemsatienfer damages te property, legal <br />fees er a~mimistrative costs. <br /> <br /> <br />