My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
86-78 Amend & supp. Chpt 1309 - Bldg - permit fees
Document-Host
>
City of Lakewood
>
Ordinances
>
1978
>
86-78 Amend & supp. Chpt 1309 - Bldg - permit fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:05:21 PM
Creation date
8/21/2003 10:23:07 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Ordinances
Date
8/21/2003
Date Adopted
1/15/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1309.05 HEATING AND REFRIGERATIC~q PEP~IT FEES. <br /> <br />(a) Domestic. <br /> (1) Heating systems <br /> Each unit in a new house <br /> Each replacement unit in existing house <br /> (2) For the installation of a unit or space heater <br /> (3) Domestic incinerator <br /> (4) Sunmer air conditioning units <br /> Size Unit (tons) <br /> Less than 2 <br /> 2 ~or more <br /> <br />$10.00 <br /> 5100 <br /> 3.00 <br /> 3.00 <br /> <br />No fee <br /> 5.00 <br /> <br />(b) <br /> <br />Con~ercial and IndUStrial. <br />(1) -Heating systems <br /> A. Each new unit and/or additions to present systems <br /> Heat Input (BTU/hr.) <br /> 150,000 or less 13.00 <br /> Over 150,000 to 300,000 15.00 <br /> Over 300,000 to 600,000 17.00 <br /> Over 600,000 25.0.0 <br /> B. For each replacement of a heating system <br /> 1. No increase in capacity 7.59 <br /> 2. Increase in capacity Base fee 7.50 <br /> PlUS $.08 for every B~J/hr. added <br /> C. Gon~ercial incinerator <br /> <br />15.00 <br /> <br />(2) <br /> <br /> Refrigeration and air conditioning <br />A. Refrigeration systems, new installations or alterations, <br /> according to quantity of refrigerant in system <br /> <br />Pefriqerants <br /> <br />Pounds C~oup 1 Group 2 Group 3 <br />Up to 5 no fee no fee $ 5.00 <br />Over 5 to 20 no fee $ 5.00 7.50 <br />Over 20 to 100 $ 7.50 7.50 12.50 <br />Over 100 12.50 12.50 25.00 <br /> <br />Classification Refrigerant Cmoups Defined <br />Group 1 Carbon Dioxide (CO) Carrene No. 1 (CH_CL_), <br /> Carrene No. 2 (CCL~F), Freon 11, FreonZ122(CCL F~) <br /> Freon 21 (CHCL_F), Freon 22 (CHCLF2), 2 z ' <br /> Freon 113 (C2C~3F3), and Freon 114 <br />Group 2 Ar~nonia (N}{i), Dichloroethylene (C_H CL ), <br /> EthYl Chloride (C~H=CL), Methyl Ch~o~id~ <br /> (CH~CL), ~%thyl F~r~ate (HCOOCH), and <br /> Sulfur Dioxide (S02). 3 <br /> <br /> Butane (C4H~.), Ethane (C2H~) , Ethylene (C2H4) , <br /> Isabutane (~33C~) and Prop~ne (C3H8). <br /> $10.00 <br /> <br />Goup 3 <br /> <br />For each wat~. r cooling tower <br />For each summer air conditioning unit <br /> <br />(Ord. 29-71. <br /> <br /> capa,,city (Tons) <br /> Upto5 <br /> Over 5 to 10 <br /> Over 10 to 25 <br /> Over 25 <br />Passed 6-21-71.) <br /> <br />10.00 <br />15.00 <br />20.00 <br />25.00 <br /> <br />1~309.06 SIGN PERMIT FEE. <br /> <br />Signs <br /> <br />$100.00 or less of valuation <br />Each additional $100.00 of <br /> valuation or part thereof <br />~rary, each <br /> <br />Fee <br /> <br />$3.00 <br /> <br /> .50 <br /> 3.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.