My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
37-97 Clifton & Forest Rd Improvement
Document-Host
>
City of Lakewood
>
Ordinances
>
1997
>
37-97 Clifton & Forest Rd Improvement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:12:25 PM
Creation date
10/18/2007 6:45:44 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Ordinances
Date
10/18/2007
Date Adopted
7/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I ~ÁHIBIT "A" <br /> <br /> <br /> <br />YVETTE M. ITìU <br />DIRECTOR OF FINANCE <br /> <br />12650 DETROIT AVENUE· 44107' 216/529-6090' FAX 216/521-1379 <br /> <br />SUSAN M. NOBILlO <br />ASSISTANT DIRECTOR OF FINANCE <br /> <br />July 21,1997 <br /> <br />Lakewood City Council <br />Lakewood, Ohio 44107 <br /> <br />Re: FlNAL REPORT OF THE BOARD OF REVISION OF ASSESSMENT <br /> <br />To the Council of the City of Lake wood: <br /> <br />The undersigned, constituting the Board of Revision of Assessment of the City of <br />Lakewood, Ohio, respectfully report that on July 9, 1997 at 7'00 p.m. in the Lakewood <br />City Hall Auditoriµm a hearing was held to hear all objections concerning the estimated <br />assessments for the improvement of Clifton Road and Forest Road in accordance with <br />Resolution 7090-95A, passed June 2, 1997, declaring the necessity of said improvement <br />We recommend that the preliminary assessment report be adjusted on a per parcel basis, <br />where appropriate, for the following situations and under the following conditions: <br /> <br />Upon receipt of evidence by the City Engineer prior to commencement of <br />construction to support that the sidewalk and/or driveway apron of a particular <br />parcel has been replaced by the property owner subsequent to July 1, 1992, the <br />City shall reduce the total assessment on said parcel up to an estimated $5.00 per <br />foot of frontage for the sidewalk and up to an estimated $ L 00 per foot of <br />frontage for the driveway apron. (The estimated dollar amounts represent the <br />property owner's share of the estimated cost of the average sidewalk and/or <br />driveway apron. The final amount of the reduction will be calculated by the City <br />Engineer after completion of improvement based upon the final cost of <br />improvement). <br /> <br />Those property owners of parcels which do not currently have driveway aprons <br />and will not have driveway aprons replaced in conjunction with the Forest Road <br />and Clifton Road improvement project, will have their assessment reduced up to <br /> <br />ft <br />t~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.