My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30-04 Amend 1309 - Permit Fees
Document-Host
>
City of Lakewood
>
Ordinances
>
2004
>
30-04 Amend 1309 - Permit Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:07:40 PM
Creation date
5/5/2004 7:28:22 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Ordinances
Date
5/5/2004
Date Adopted
5/3/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Solar heat 30.00 <br /> (2) Unit or space heater: 10.00 <br /> (3/ Domestic incinerator: 10.00 <br /> (4 Air conditioning units: <br /> A. Up to 3 ton unit, each 10.00 <br /> B. 3 ton unit or over 20.00 <br /> (5) Free standing fireplace, gas logs and/or <br /> heating unit: 10.00 <br /> (6) Energy vent type damper: 10.00 <br /> (b) Commercial - Industrial. <br /> (1) Heating systems: <br /> A. For each new unit and/or additions to <br /> present systems: <br /> 1. Up to 150,000 BTU/Hr. Heat Input 30.00 <br /> 2. Over 150,000 up to 300,000 BTU/Hr. <br /> Heat Input 40.00 <br /> 3. Over 300,000 up to 600,000 BTU/Hr. <br /> Heat Input 50.00 <br /> 4. All over 600,000 BTU/Hr. 60.00 <br /> B. For each replacement of a heating system: <br /> 1. No increase in capacity 20.00 <br /> 2. Increase in capacity Base fee 20 00 <br /> Plus $.10 for every M.B.T.U./Hr. added <br /> C. Heat pump: <br /> 1. Residential 30,00 <br /> 2. Commercial 60.00 <br /> (2) Air conditioning: <br /> A. For each water cooling tower, each: 50.00 <br /> B. For each air conditioning unit: <br /> 1. Up to 5 ton capacity 20.00 <br /> 2. Over 5 ton capacity up to 10 ton <br /> capacity 25.00 <br /> 3. Over 10 ton capacity up to 25 ton <br /> capacity 40.00 <br /> 4, All over 25 ton capacity 50.00 <br /> <br /> 1309.06 SZGN PERt, ITT FEE. <br /> (a) Permanent signs: 10.00 <br /> (b) In addition to the fee in subsection (a) hereof for each square <br />foot of sign area which is determined by the visible copy: .25 <br /> (c) Temporary signs, each: 10.00 <br /> <br /> 1309.07 TANKS - STORAGE. <br /> (a) Underqround. <br /> ii/ Up to 3,000 gallons: 20.00 <br /> 3,000 gallons to 5,000 gallons: 25.00 <br /> 5,000 gallons to 12,000 gallons: 30.00 <br /> 12,000 gallons to 20,000 galIons: <br /> <br /> (b) Aboveclround. <br /> 1) Base fee 20.00 <br /> 2) Plus an amount per 1,000 gallons 5.00 <br /> (c) Removal of Underqround and Aboveoround Tanks. 5.00/storage tank <br /> 1309.08 SURFACTNG AND RESURFACTNG. <br />sealan~a.) Surfacing or resurfacing of driveways or parking lots excluding liquid <br /> <br /> (1) For the first 1,000 square feet of aggregate <br /> surface area or part thereof, minimum fee: 10.00 <br /> (2) For each additional 500 square feet of <br /> aggregate surface area, or part thereof: 2.00 <br /> 1309.09 COMBTNATI'0N PERI~I*T FEE. <br />Notwithstanding any other provisions of th s chapter, a home owner who <br />occupies the premises wherein the work is to be performed may obtain a comb nation <br />permit fee to cover all or any alterations, remodeling, plumb ng, e ectrical or heating <br />work, provided that the value of such work shall not exceed three thousand five <br />hundred dollars ($3,500) in total $10.00 <br /> <br />50.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.