Laserfiche WebLink
<br />PLEASE SUBSTITUTE FOR ORDINANCE NO. 62-04 PLACED <br />ON 1ST REACING & REFERRED TO THE COMMITTEE OF THE <br />WHOLE 6/7/04. 2ND READING 6/21/04. DEFERRED 7/6/04.. <br /> <br />(Substitute for prior 62-04) <br />ORDINANCE NO: 62-04 <br /> <br />BY:Corrigan. Demro. Dever~ Dunn~ VitzGerald~ <br />M::1dÜ!:an~ Seelie. <br /> <br />AN ORDINANCE authorizing the Mayor or his designee to engage contracting firms to <br />provide professional services in the design, preparation of specifications and contract <br />administration and to advertise for bids and enter into contract with the lowest and best bidder for <br />Site Preparation, in support of the retention and expansion of Phil Vedda & Sons, Inc., (Vedda) <br />including Excavation and Grading, GEOPIER Foundation Company, Inc. and Geogrid Fabric Soil <br />Reinforcement, Engineered Fill, Building Slab Reinforcement and all other necessary site work <br />related to such site preparation of the property located at 12000 Berea Road Lakewood, Ohio <br />(Permanent Parcel Number 315-25-007) in accordance with the Administrative Code of the City of <br />Lakewood, contracts not to exceed specified amounts shown without separate resoiution of <br />Council. <br /> <br />WHEREAS, the City desires to support the retention, expansion and significant planned <br />capital investment of Vedda, in the purchase and redevelopment of the property located at 12000 <br />Berea Road, Lakewood, Ohio (PP#315-25-007); and <br /> <br />WHEREAS, the City retained Hull and Associates, Inc to undertake a Phase I/II <br />Environmental and Geotechnical Assessment of the vacant site at 12000 Berea Road which <br />indicated costly geotechnical soil issues on the site, far exceeding the typical site preparation <br />costs, that affect the ability to construct a building on the site; and <br /> <br />WHEREAS, the City further consulted with a team of experts to document the necessary site <br />preparation and to develop associated cost estimates due to the geotechnical soil issues present <br />on the site; and <br /> <br />WHEREAS, pursuant to Ordinance 63-04 adopted by Lakewood City Council on <br />2004, the City of Lakewood is authorized to enter into a Development Agreement with Phil Vedda <br />& Sons, Inc. setting forth the. respective rights and obligations of both parties regarding the Vedda <br />Printing expansion project, including the City's obligation to provide Two Hundred Thousand Dollar <br />($200,000.00) through the Public Investment Program (PIP) arm of the Economic Development <br />Fund (EDF) Program and Three Hundred Thousand Dollars ($300,000) through issuance of a Tax <br />Increment Financing (TIF) Bond to fund the necessary site improvements in support of the Phil <br />Vedda & Sons, Inc. expansion project; and <br /> <br />WHEREAS, pursuant to Ordinance 65-04 and Ordinance 64-04 adopted by Lakewood City <br />Council on , 2004, the Mayor is authorized to expend EDF funds and to establish a TIF <br />for the purpose of funding the necessary Site Preparation; and <br /> <br />WHEREAS, this Council by a vote of at least five (5) members elected hereto determines <br />that this ordinance is an emergency measure, and that this ordinance shall take effect at the <br />earliest date possible as set forth in ARTICLE III, SECfIONS 10 and 13 of the SECOND AMENDED <br />CHARTER OF THE CITY OF LAKEWOOD, and that immediate action is necessary to provide for the <br />immediate preservation of the public property, health and safety, and to facilitate the timely site <br />preparation necessary for the redevelopment of said property for an economically viable and tax <br />generating use. NOW, THEREFORE, <br /> <br />BE IT ORDAINED BY THE CITY OF LAKEWOOD, STATE OF OHIO: <br /> <br />Section 1. . That the Council of the City of Lakewood hereby authorizes the Mayor or his <br />designee to enter into an agreement with GEOPIER Foundation Company, Inc. as the sole provider <br />for the Geogrid Fabric Soil Reinforcement, Engineered Fill, and Building Slab Reinforcement, or, in <br />the alternative to advertise for bids and enter into contract with the iowest and best bidder for <br />such appropriate alternative method for soil reinforcement, engineered fill, and building slab <br />reinforcement as the City Engineer shall determine, and to enter into contracts with Hull & <br />Associates, Inc. and Weber Architecture, Inc. to provide professional services including, but not <br />limited to, the design, preparation of specifications and contract administration and to advertise for <br />bids and enter into contract with the lowest and best bidder in accordance with the Administrative <br />