Laserfiche WebLink
<br />1309.04 ELECTRICAL PERMIT FEES. , <br />The base fee for each electrical permit shall be twenty-five dOllars ($25.'00) to which the <br />following shall be added: <br /> <br />(a) Each 120 volt receptacle: $1.00 Fee <br /> <br />(b) Each fixture outlet: $1.00 Fee <br /> <br />(c) Each outlet or receptacle in excess of 120 volts: $6.00 Fee <br /> <br />(d) Motors, transformers, generators, batteries, rectifiers, electrostatic filters and <br />other power distribution and connections, according to horse power: <br />3412 BTU = 1 KW = 1.341 HP <br />Each unit: <br />1/4 HP or less: $5.00 Fee <br />1/3 HP to and including 3/4 HP: $10.00 Fee <br />7/8 HP to and including S HP: $15.00 Fee <br />Over 5 HP: $20.00 Fee <br /> <br />(e) X-ray machines or equipment: $25.00 Fee <br /> <br />(f) CQrrections or alterations: $20.00 Fee <br /> <br />1309.05 HEATING AND AIR CONDITIONING PERMIT FEES. <br /> <br />(a) Domestic. <br />(1) Heating systems: <br />A. Each unit in a new home and/or replacement/additional units in an <br />existing hQme: $30,00 Fee <br />B. Solar heat: No Fée <br />(2) Air CQnditioning units: $30.00 Fee <br />(3) Free standing fireplace, gas logs and/or heating unit: $30,00 Fee <br />(4) Energy vènt type damper: $10.00 Fee <br />(5) Residential heat pump: $30.00 Fee <br /> <br />(b) Commercial - Industrial. <br />(1) Heating systems: <br />A. For each new unit and/or replacements/additions to present systems: <br />1. Up to 150,000 BTU/Hr. Heat Input: $30.00 Fee <br />2. Over 150,600 up to 300,600 BTU/Hr. Heat Input: $40.00 Fee <br />3. Over 300,000 up to 600,000 BTU/Hr. Heat Input: $50.00 Fee <br />4. All over 600,000 BTU/Hr.: $60.00 Fee <br />5. Commercial heat pump: $60.00 Fee <br />B. Solar heat: No Fee <br />(2) Air conditioning: <br />A. For each water cooling tower: $50.00 Fee <br />B. For each air conditioning unit or chiller type unit: <br />1. Up to 5 ton capacity: $30.00 Fee <br />2, Over 5 ton capacity up to 10 ton capacity: $40.00 Fee <br />3. Over 10 ton capacity up to 25 ton capacity: $50.00 Fee <br />4. All over 25 ton capacity: $60.00 Fee <br /> <br />1309.06 SIGN PERMIT FEE. <br />(a) Permanent signs: $25.00 Fee <br />