My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
76-06 Amend Chapter 1309 Permit Fees
Document-Host
>
City of Lakewood
>
Ordinances
>
2006
>
76-06 Amend Chapter 1309 Permit Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:13:01 PM
Creation date
10/31/2007 7:57:25 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Ordinances
Date
10/31/2007
Date Adopted
12/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(g) Panel, services, related equipment, and disconnects: $50.00 Each <br /> (h) Low voltage smoke and/or fire alarm systems: $50.00 Fee <br /> 1309.05 HEATING AND AIR CONDITIONING PERMIT FEES. <br /> (a) Domestic. <br /> (1) Heating systems: <br /> A. Each unit in a new home and/or replacement/additional units in an <br /> existing home: $40.00 Fee <br /> B. Solar heat: No Fee <br /> (2)Air conditioning units: $40.00 Fee <br /> (3) Free standing fireplace, gas logs and/or heating unit: $40.00 Fee <br /> (4) Energy vent type damper: $20.00 Fee <br /> (5) Residential heat pump: $40.00 Fee <br /> (b) Commercial -Industrial. <br /> (1) Heating systems: <br /> A. For each new unit and/or replacements/additions to present systems: <br /> 1. Up to 150,000 BTU/Hr. Heat Input: $40.00 Fee <br /> 2. Over 150,000 up to 300,000 BTU/Hr. Heat Input: $50.00 Fee <br /> 3. Over 300,000 up to 600,000 BTU/Hr. Heat Input: $60.00 Fee <br /> 4. All over 600,000 BTU/Hr.: $70.00 Fee <br /> 5. Commercial heat pump: $70.00 Fee <br /> B. Solar heat: No Fee <br /> (2) Air conditioning: <br /> A. For each water cooling tower: $100.00 Fee <br /> B. For each air conditioning unit or chiller type unit: <br /> 1. Up to 5 ton capacity: $40.00 Fee <br /> 2. Over 5 ton capacity up to 10 ton capacity: $50.00 Fee <br /> 3. Over 10 ton capacity up to 25 ton capacity: $60.00 Fee <br /> 4. All over Z5 ton capacity: $70.00 Fee <br /> 1309.06 SIGN PERMTT FEE. <br /> a. Permanent signs: $30.00 Fee <br /> b. In addition to the fee in subsection (a) hereof for each square foot of sign area <br /> which is determined by the visible copy: $2.00 Fee <br /> c. Temporary signs, each: $15.00 Fee <br /> 1309.07 TANKS -STORAGE. <br /> (a) Underground. <br /> (1) Up td 3,000 gallons: $25.00 Fee <br /> (2) 3,000 gallons to 5,000 gallons: $30.00 Fee <br /> (3) 5,000 gallons to 12,000 gallons: $35.00 Fee <br /> (4)12,000 gallons to 20,000 gallons: $55.00 Fee <br /> <br /> (b)Aboveoround. <br /> (1) Base fee: $25.00 Fee <br /> (2) Plus an amount per 1,000 gallons: $10.00 Fee <br /> <br /> (c) Removal of Underground and Aboveground Tanks. $10.00 Fee/per storage tank <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.