Laserfiche WebLink
<br />(1) Where storm sewer drainage areas include 10 or more acres disturbed at one <br />time, a temporary (or permanent) sediment settling pond must be provided until <br />final stabilization of the site. In single-family residential construction, final <br />stabilization is after the houses are built and permanent landscaping is done. <br /> <br />A. Alternative equivalent controls may be used if the owner can show, in <br />writing, that the Ohio EPA approved the use of the alternatives in the <br />Storm Water Pollution Prevention Plan (SWP3) for the site, subject to the <br />approval of the City Engineer. <br /> <br />B. It is recommended that for drainage locations of less than 10 acres, <br />smaller sediment settling basins and/or Sediment Traps be used. <br /> <br />(2) Each facility's storage capacity shall be no less than sixty-seven (67) cubic <br />yards per acre of total contributing drainage area. The storage volume will be <br />measured from the bottom of the basin to the top of the primary (principle) <br />spillway. <br /> <br />(3) Permanent storm water management ponds that are designed to trap <br />sediment during construction shall be designed to provide for a slow release of <br />sediment-laden water. The draw down time shall meet the criteria in the Ohio <br />Rainwater and Land Development manual. <br /> <br />(4) The design configuration between inlet(s) and the outlet of settling ponds <br />must provide at least two units of length for each one unit of width (> 2: 1 length <br />to width ratio). <br /> <br />(5) The depth of the sediment settling pond must be less than or equal to five <br />(5) feet. <br /> <br />(6) Sediment must be re.moved from the sediment settling ponds when the <br />design capacity has been reduced by 40%. <br /> <br />(7) Public safety, especially as it relates to children, must be considered in the <br />design. Alternative sediment controls must be used where site limitations would <br />preclude a safe design. <br /> <br />(8) Temporary sediment settling ponds will not be constructed in any stream <br />channel. <br /> <br />U) Storm SeWer Inlet Protection: <br /> <br />21 <br />