My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
28-14 Amend Chp. 1339 Storm Water Mgmt
Document-Host
>
City of Lakewood
>
Ordinances
>
2014
>
28-14 Amend Chp. 1339 Storm Water Mgmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 4:54:01 PM
Creation date
12/19/2014 4:53:02 PM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1339.08 APPLICATION PROCEDURES FOR STORM WATER MAN- <br />AGEMENT PLANS (SWMP) AND ABBREVIATED STORM WATER <br />POLLUTION PREVENTION PLANS (SWP3). <br />(a) Applicants or their consultants may request a pre- application meeting wi0r <br />the city engineer and Building Department to review all SWMP or abbrevi- <br />ated SWP3 requirements and fees. <br />(b) Sites with a disturbed area of 8,000 square feet or less shall submit their <br />plan, SWMPs or abbreviated SWP3, hydraulics and hydrology report, and <br />application to the city engineer for approval. <br />(c) Sites with a disturbed area of 8,000 square feet or more shall submit their <br />plan, hydraulics and hydrology report and application directly to the city <br />engineer. The City and local soil and water conservation district shall re- <br />view and provide comments (if any). The process shall repeat until approv- <br />al is reached (i.e., a recommnendation of approval from the local soil and wa- <br />ter conservation district). <br />(d) SWMPs and SWP3s developed by the site owners and approved by the City <br />in accordance with this regulation do not relieve the site owner of responsi- <br />bility for obtaining and complying with all other necessary permits and ap- <br />provals from federal, state, county, and local agencies and departments. If <br />requirements vary, the most stringent requirement shall be followed. <br />SWMPs submitted to the city engineer for review and approval shall be ac- <br />companied by all other required permits and documentation relevant to the <br />project, including but not limited to the permits required and issued by the <br />US Army Corps of Engineers, Ohio EPA and ODNR Division of Water. <br />(e) The application must include a letter or report from the Cuyahoga Soil and <br />Water Conservation District (CSWCD) that states the SWMP has been re- <br />viewed and meets all requirements of the Ohio EPA and this chapter. <br />(i) Three sets of the SWMP documents or abbreviated SWP3s and all items re- <br />quired by this chapter shall be submitted to the city engineer with text mate- <br />rial being submitted on 8.5 by 11 inch paper and drawings on no larger than <br />24 by 36 inch sized paper with scaled reductions on 11 by 17 inch paper. <br />(g) The city engineer shall review the documents, including the review report <br />from the CSWCD, and shall approve or return these with comments and <br />recommendations for revisions within 30 working days after receipt of the <br />plan as described above. A plan rejected because of deficiencies shall re- <br />ceive a report stating specific problems. At the time of receipt of a revised <br />plan, another 30 -day review period shall begin. <br />(h) Approved SWMPs or abbreviated SWP3s shall terminate 24 months after <br />the effective date of the plan approval if the owner or operator has not un- <br />dertaken a continuing program of installation or modification or has not en- <br />tered into a binding contractual obligation to undertake and complete, with- <br />in a reasonable time, a continuing program of installation or modification. <br />The city engineer may extend these dates of expiration by up to 12 months <br />if the applicant submits, within a reasonable time before the termination <br />date, a written request containing information that, in the judgment of the <br />city engineer, adequately justifies an extension of time. <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.