Laserfiche WebLink
pacity equal to 110 percent of the volume of the largest container in the <br />storage area. All additional requirements of the local fine authority must <br />be followed. If the fuel tanks have a self - contained "dike," the plug will <br />be kept in the "dike" tank at all times. <br />(4) Any toxic or hazardous wastes and contaminated soils must be dis- <br />posed of according to all applicable environmental laws and statutes. <br />Local health districts and Ohio EPA can provide guidance on these is- <br />sues. <br />(5) On a site with a prior industrial land use or a site that is contaminated <br />with gasoline, fuel oil, hydrocarbon based chemicals or other Ohio <br />EPA regulated contaminates, the storm water is considered wastewater. <br />A permit from Ohio EPA is required to address these sites. <br />(6) Proper permits shall be obtained for development projects on solid <br />waste landfill sites. <br />(7) Paint, paint washing liquids, excess paints and other paint wastes are <br />considered solid wastes and shall be disposed of in accordance with ap- <br />plicable state regulations. Appropriate handling of these wastes shall <br />occur at the site so as to prevent the discharge of these wastes into sur- <br />face or ground waters. <br />(8) Restroom facilities will be provided for site workers at all times that <br />workers are present on the site and during all phases of the construc- <br />tion. <br />(9) All required permits from appropriate federal, state, or local agencies <br />are required to develop land with a previous industrial or commercial <br />use or another use that may have led to soil contamination by a regulat- <br />ed pollutant. <br />(x) Pre - winter Stabilization: If the development area will, or is planned to re- <br />main, active through the winter months, the owner of the development area <br />shall hold a pre - winter stabilization meeting. The meeting will be held be- <br />fore October 1. The owner shall invite the operator, developer, engineer, <br />contractor, city engineer and anyone else requested by the city engineer to <br />the meeting. <br />(y) Storm Water Basins: <br />(1) Pool Geometry: The minimum length -to -width ratio for the pond is 3:1 <br />(the length will be three times the width). <br />(2) Riser in Embankment: The riser shall be located within the embank- <br />ment for purposes of maintenance access. Access to the riser will be by <br />manholes. <br />(3) Water Drains: Each retention basin shall have a drainpipe that can <br />completely drain the pond. The drain shall have an elbow within the <br />pond to prevent sediment deposition from plugging the drain. <br />(4) Adjustable Gate Valves: Both the storm water management and water <br />quality basin drains shall have adjustable gate valves. Valves shall be <br />located inside the riser at a point where they will remain dry and can be <br />49 <br />