Laserfiche WebLink
(8) Disturbed areas and areas used for storage of materials that are exposed <br />to precipitation shall be inspected for evidence of, or the potential for, <br />pollutants entering the drainage system. <br />(9) Erosion and sediment controls identified in the Storm Water Pollution <br />Prevention Plan shall be observed to ensure that they are operating cor- <br />rectly. <br />(10) Discharge locations shall be inspected to ascertain whether erosion and <br />sediment control measures are effective in preventing significant im- <br />pacts to the receiving waters. <br />(I OLocations where vehicles enter or exit the site shall be inspected for ev- <br />idence of off -site vehicle tracking. <br />(12) Sensitive areas including riparian and wetland setbacks shall be ob- <br />served to ensure that they remain well marked and undisturbed. <br />(13)If the inspection reveals that a control practice is in need of repair or <br />maintenance, with the exception of sediment settling ponds, it must be <br />repaired or maintained within three days of the inspection. Sediment <br />settling ponds must be repaired or maintained within 10 days of the in- <br />spection. <br />(14)If any inspection reveals that a control practice fails to perform its in- <br />tended function and that another, more appropriate control practice is <br />required, the Construction Site Conservation Plan must be amended <br />and the new control practice must be installed within 10 days of the in- <br />spection. <br />(15) If the inspection reveals that a control practice has not been implement- <br />ed in the time required by this ordinance it must bennstalled within 10 <br />days from the date of inspection. <br />(16)If the inspection reveals that a planned control practice is not needed, <br />the record must contain a statement of explanation as to why the con- <br />trol practice is not needed. <br />(w) Control of Materials and Debris: Site management practices shall be im- <br />plemented to prevent toxic materials, hazardous materials, or other debris <br />from entering the City's and state's water resources or wetlands. These <br />practices shall include, but are not limited to, the following: <br />(1) A covered dumpster shall be made available for the proper disposal of <br />construction site waste materials, garbage, plaster, drywall, grout, and <br />gypsum. A second covered dumpster will be provided for the proper <br />disposal of toxic and hazardous wastes. <br />(2) The washing of excess concrete material into a street, catch basin, or <br />other public facility or natural resource shall not occur. A designated <br />area for concrete washouts shall be made available and used for all <br />concrete washouts. <br />(3) All fuel tanks and drums shall be stored in a marked storage area. A <br />dike shall be constructed around this storage area with a minimum ca- <br />48 <br />