Laserfiche WebLink
ment, and other wastes control practices in an amount equal to 20 percent of <br />the estimate approved by the city engineer, of the construction and, where <br />necessary, removal of such practices. <br />(i) Slow Release Devices. Performance and maintenance guarantees will be <br />maintained on the temporary sediment removal slow release devices in- <br />stalled in detention and retention basins until the entire site has reached fi- <br />nal soil stabilization. Final stabilization in single- family residential devel- <br />opments is when 90 percent of the homes are constructed with their lawn <br />completely installed and nay remaining unbuilt lots having been permanent- <br />ly stabilized with a uniform ground cover at a growth density of 80 percent <br />or better. <br />Q) Release. The construction maintenance guarantee shall not be released by <br />the City until all temporary soil erosion and sediment control practices that <br />are no longer needed have been removed, properly disposed of and any <br />trapped sediment has been stabilized. <br />1339.15 STORM WATER MANAGEMENT FEES. <br />The following review fees, reserve deposits, first -year annual post - construction <br />fee and performance bond must be deposited with the City division of housing <br />and building at the time of application and prior to the commencement of soil <br />disturbing activities: <br />* Additional re- review of plan submissions shall be charged 25 percent of the <br />review fee per submittal. <br />Disturbed Area <br />Performance Bond <br />Reserve deposit <br />Annual post - <br />8,000 SF to 43,559 SF <br />$1,500 <br />for inspection <br />pectin <br />construction <br />Disturbed area <br />Review fee <br />dforin <br />BMP inspec- <br />tion <br />tion fee per <br />site <br />Less than 81000 <br />$250 <br />$250 <br />Not applica- <br />SF <br />ble <br />8,000 SF to <br />$500 <br />$1,000 <br />$250 <br />43,559 SF <br />One acre to five <br />$1,000 <br />$2,000 <br />$300 <br />acres <br />Over five acres <br />$250 per whole <br />$500 per whole <br />$500 <br />acre rounded up <br />acre rounded up <br />* Additional re- review of plan submissions shall be charged 25 percent of the <br />review fee per submittal. <br />Disturbed Area <br />Performance Bond <br />Less than 8,000 SF <br />None <br />8,000 SF to 43,559 SF <br />$1,500 <br />One acre to five acres <br />$2,500 <br />Over five acres <br />$5,000 <br />Funds shall be withdrawn from the Reserve deposit and charged at the following <br />fees or hourly rates for any work completed by representatives of the city engi- <br />neer related to the inspection and enforcement of this regulation. The reserve <br />deposit shall not fall below 50 percent of the original deposit until the project is <br />completed. <br />Disturbed Area Inspection Fee per site <br />73 <br />