Laserfiche WebLink
(A) the location and depth proposed for the new ducts or conduits; and <br />(B) the Excess Capacity that will exist in such ducts or conduits after <br />installation of the applicant's Facilities. <br />(7) The location and route of all Facilities to be located under the surface <br />of the ground, including the line and grade proposed for the burial at all <br />points along the route which are in the Public Right -of -Way. Included <br />with the installation shall be magnetic and florescent tape placed at a <br />minimum of one foot to a maximum of two (2) feet above the entire <br />Facility as installed for the purpose of locating the Facility during fu- <br />ture Construction activities or other such location device as approved <br />by the Director. The tape shall be marked with the type of Facility in- <br />stalled as approved by the City. <br />(8) The method of any underground installation (for example, open trench- <br />ing or boring). <br />(9) The location of all existing underground utilities, conduits, ducts, pipes, <br />mains and installations known by the applicant that are in the Public <br />Right -of -Way along the underground route proposed by the applicant. <br />(10)The location(s), if any, for interconnection with the Facilities of other <br />Service Providers. <br />(II)The construction methods to be employed for protection of existing <br />structures, fixtures and Facilities in or adjacent to the Public Right -of- <br />Way. <br />(12)The structures, improvements, Facilities and obstructions, if any, that <br />the applicant proposes to temporarily or permanently remove or relo- <br />cate. <br />(13) The proposed storage locations for vehicles and materials to be utilized <br />during Construction, to be field - verified with the City. <br />(14)The impact of Construction, Reconstruction, installation, maintenance <br />or repair of Facilities on trees in or adjacent to the Public Right -of -Way <br />along the route proposed by the applicant, together with a landscape <br />plan for protecting, trimming, removing, replacing and restoring any <br />trees or areas disturbed during Construction in accordance with appli- <br />cable provisions of this chapter. <br />(15)Information to establish that the applicant has obtained all other gov- <br />ernmental approvals and permits to Construct and operate the Facilities <br />and to offer or provide the Services. <br />(16)The identity of, and contact information for, each subcontractor of the <br />Service Provider that will do work in connection with the Construction, <br />Reconstruction, installation, maintenance or repair of Facilities, includ- <br />ing restoration work. If the identity of any subcontractor is not known <br />at the time that the application is filed, the Service Provider shall sup- <br />plement the application as soon as possible after the information is <br />available which shall in every case be at least forty-eight (48) hours <br />prior to performance of any work by such subcontractor. <br />(02299394- 1) <br />