Laserfiche WebLink
(c) Construction Codes. Facilities shall be Constructed, Reconstructed, in- <br />stalled, repaired, operated, Excavated and maintained in accordance with all <br />applicable federal, State and local codes, rules, regulations and technical <br />codes including, but not limited to, the National Electrical Safety Code. <br />(d) Traffic Control Plan. All Permit applications which involve a Lane Ob- <br />struction or work on, in, under, across or along any Public Right -of -Way <br />shall be accompanied by a traffic control plan demonstrating the protective <br />measures and devices that will be employed, consistent with the ODOT's <br />Uniform Manual of Traffic Control Devices and other applicable ODOT <br />regulations, to prevent injury or damage to Persons or property and to min- <br />imize disruptions to efficient pedestrian and vehicular traffic. The Director <br />may require the Service Provider to use and employ the City Police Force <br />for Traffic Control. <br />(e) Issuance of Permit. Within ten (10) business days after submission of all <br />plans and documents required of the Construction Permit applicant, the Di- <br />rector, if satisfied that the applications, plans and documents comply with <br />all requirements of this chapter, shall issue a Construction Permit authoriz- <br />ing the Construction, Reconstruction, installation, maintenance or repair of <br />the Facilities, or Excavation in the Public Right -of -Way, subject to such fur- <br />ther conditions, restrictions or regulations affecting the time, place and <br />manner of performing the work as the Director may deem necessary or ap- <br />propriate. Such ten (10) business day period shall begin after all submis- <br />sions are deemed by the Director to be complete and in accordance with the <br />requirements of this chapter; provided, however, that if state or federal law <br />specifically prohibits application of the ten (10) business day period, it shall <br />be waived to the extent so prohibited. <br />(i) Coordination of Construction Activities. All Service Providers are required <br />to cooperate with the City, including its Service and Safety forces, and with <br />each other. All Construction, Reconstruction, installation, Excavation, ac- <br />tivities and schedules shall be coordinated, as ordered by the Director, to <br />minimize public inconvenience, disruption or damages. Owners of adjoin- <br />ing properties shall be notified by the Service Provider at least twenty-four <br />(24) hours in advance of work that may affect their property. <br />(g) Modification of Construction Schedule. The Service Provider may modify <br />the construction schedule at any time provided that forty-eight (48) hours <br />advance notice is given to the Director. <br />(h) Least Disruptive Technoloa. To the extent reasonably possible, all Facili- <br />ties shall be Constructed, Reconstructed, installed, maintained or repaired in <br />the manner resulting in the least amount of damage and disruption of the <br />Public Right -of -Way. Unless otherwise authorized by the Director for good <br />cause, Service Providers Constructing, Reconstructing, installing, maintain- <br />ing or repairing Underground Facilities shall utilize Trenchless Technology, <br />including, but not limited to, horizontal drilling, directional boring, and mi- <br />crotunneling, if technically or technologically feasible. <br />(i) Compliance with Permit. All Construction practices and activities shall be <br />in accordance with the Construction Permit and approved final plans and <br />specifications for the Facilities. The City shall be provided access to the <br />work and such further information as he or she may require to ensure com- <br />pliance with such requirements. Field changes may be approved by the Di- <br />102299394 - 11 <br />