My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8739-14 Authorize asbestos removal and abatement at McKinley
Document-Host
>
City of Lakewood
>
Resolutions
>
2014
>
8739-14 Authorize asbestos removal and abatement at McKinley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2014 11:41:56 AM
Creation date
4/30/2014 11:41:28 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
alternatives to Brownfield Cleanup Analysis, Community Relations Plan, and <br />Specifications or Remedial Action Plan, as applicable. <br />(f) Environmental Assessments. A copy of the certified asbestos survey, Phase I <br />Environmental Assessment and Phase 2 Environmental Assessment, as <br />applicable. <br />(g) Additional Documents. Such other papers and documents regarding Subgrantee, <br />the Subgrantee's Work, the Subgrantee's contractor(s), Project Engineer or the <br />Project as Grantor may require. <br />33 Conditions Precedent to All Disbursements of Subgrant Proceeds. Grantor shall not be <br />obligated to make Disbursements (as defined in Schedule 1) unless: <br />(a) Work Contracts. The final executed Work Contracts; <br />(b) All conditions precedent to that Disbursement have been satisfied, including <br />without limitation, performance of all of the then pending obligations of Subgrantee <br />under this Agreement, and the satisfaction of any conditions and requirements of this <br />Agreement required to be performed by any other party ; <br />(c) Grantor shall be satisfied as to the continuing accuracy of the Budget and that <br />Subgrantee's Work is being completed in accordance with the Specifications, the Work <br />Schedule, and the Work Contracts. <br />(d) No Default exists under this Agreement and no event, circumstance or condition <br />exists which, with the passage of time or the giving of notice, would constitute a Default <br />under this Agreement. <br />(e) No litigation, claims or proceedings are pending or threatened against Subgrantee, <br />or the Property, which litigation, claims or proceedings, in the sole and exclusive <br />judgment of Grantor, would materially affect Subgrantee's ability to perform any of its <br />respective obligations under any of this Agreement. <br />(f) No event, circumstance or condition exists or has occurred which could, in <br />Grantor's sole judgment, delay or prevent the completion of Subgrantee's Work by the <br />Completion Date; <br />(g) All representations and warranties made by Subgrantee to Grantor herein and <br />otherwise in connection with this Grant continue to be accurate; all statements and <br />representations made in the Grant Application continue to be accurate; <br />(h) Grantor shall have received evidence satisfactory to it that all Grant Proceeds <br />disbursed to date have been applied to payment of Eligible Costs; <br />
The URL can be used to link to this page
Your browser does not support the video tag.