My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8937-17 Authorize Design-Build Contract for WWTP
Document-Host
>
City of Lakewood
>
Resolutions
>
2017
>
8937-17 Authorize Design-Build Contract for WWTP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 4:42:36 PM
Creation date
7/18/2017 4:42:03 PM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. In the event of selection of a Fixed Contract Sum: The Contract Sum shall <br />represent the total amount payable to the DB for the performance of the entirety of the Work <br />including the Construction Stage. <br />B. In the event of selection of GMP Pricing: Upon selection by the City, the Contract <br />Sum shall be governed by the calculation associated with the Construction Stage Work. <br />As fully addressed in the General Conditions, no claims for extras, additions or <br />alterations shall be made by DB except in the instance of an approved Change Order. No <br />modification, amendment or alteration shall be made in or to the Contract Documents, except by <br />Change Order in accordance with the Contract Documents. When a Change Order is executed, <br />the Contract Sum shall be accordingly adjusted as shall the Schedule of Values. <br />Immediately after the City selects either a GMP or Fixed Price associated with the <br />Construction Stage, the DB shall generate a Schedule of Values setting forth a detailed statement <br />outlining the elements and portions of the Contract Sum, allocating monetary amounts for the <br />various parts of the Work as shall be utilized as the basis for submitting and reviewing progress <br />payments. Same shall be reviewed by the City and approved if deemed acceptable. The <br />Schedule of Values shall be amended only by change order. Additionally, the DB shall provide <br />such other pertinent information as the City requires, including a guaranteed date of completion <br />and other information as the City Engineer prescribes. The City Engineer may also require the <br />presentment of other forms and reporting documents generated by the City, the Criteria Engineer <br />or by the DB and those forms shall be utilized uniformly during the course of performance of the <br />Project and submitted in accordance with such directions and on a timely basis as the City <br />directs. <br />ARTICLE III: CITY OPTIONS <br />The City reserves the right to accept or reject some or all of the components of the Work <br />proposed by the DB and to allow for the bidding and /or performance of the Work by others in its <br />sole and exclusive discretion. In such event, the DB shall be compensated for its generation of <br />plans and specifications by the FOR and /or other activities undertaken by the DB related to <br />activities required of the DB prior to receipt of an Authorization to Proceed with performance of <br />the Work. In such instance the City shall be granted, without further action, an irrevocable and <br />permanent license to utilize the plans and specifications and other work product of the DB for <br />any purpose the City deems appropriate and/or necessary. <br />The City's option rights under this Article III are independent of its "Termination for <br />Convenience" rights as set forth in Article 10 of the General Conditions. The City retains the <br />right to terminate this Contract for convenience at any time in accordance with Article 10 of the <br />General Conditions. <br />ARTICLE IV. SUPPLEMENTATION OF CITY DIRECTIONS AND <br />PROCEDURES <br />131Page __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.