Laserfiche WebLink
City of Lakewood, Ohio Integrated Wet Weather Improvement Plan I Phase 2 <br />BundIt 5: Remaining Minor Oveifloivs <br />• Construct LEWS 1225 (CSO 055): Sewer separation. Overflow eliminated. <br />• Construct LEWS 1110 (CSO 058): Diversion sewer. Controlled to 4 untreated CSOs per <br />typical year. <br />• Construct LEWS 1045: Bulkhead interceptor connection, add pump station to serve area. <br />No overflow in 2 -year storm event. <br />• Construct LEWS 1055 -1060: Source Control, Green Infrastructure, Relief Sewer, Regu- <br />lator Modification. No overflow in 2 -year storm event. <br />• Construct LEWS 1285 -1295: Relief Sewer, Regulator Modification. No overflow in 2- <br />year storm event. <br />• Construct LEWS 1210: Source control. No overflow in 2 -year storm event. <br />• Construct LEWS 1215: Regulator modification. No overflow in 2 -year storm event. <br />• Construct LEWS 1220: Source control, Green Infrastructure. No overflow in 2 -year <br />storm event. <br />ko <br />