Laserfiche WebLink
a l <br />� City of Lakewood, Ohio <br />. <br />Integrated Wet Weather Improvement Plan I Phase 2 <br />3. Prioritized potential 5 -year bundles of measures (exclusive of ongoing activities), sub- <br />ject to affordability limits <br />Bundle 2: CSO 059 and Honnetivood <br />• Construct LEWS 1040: Relief to Interceptor picking up all CSOs and manage at CSO <br />059. No overflow in 2 -year storm event. <br />• Construct LEWS 1035 (CSO 059): Underground Tank Storage (storage to manage also <br />LEWS 1040 and LEWS 1195 TBD). Controlled to 4 untreated CSOs per typical year. <br />• Construct LEWS 1195: Close off and convey more to Interceptor and manage at CSO <br />059. No overflow in 2 -year storm event. <br />• Construct LEWS 1070: Source Control, Diversion Sewer, Pump Station, Storm Sewer. <br />No overflow in 2 -year storm event. <br />• Design Bundle 3: CSO 057 and Detroit Avenue /West Clifton. <br />Bundle 3: CSO 057 and Detroit AvenueAVes7 Clifton <br />• Construct LEWS 1130 -1135 (CSO 057): Belle Storage Tunnel, Lakewood Park Storage <br />Basin. Controlled to 4 untreated CSOs per typical year. <br />• Construct RRES 1145: Source Control, Sewer Separation, Regulator Modification, Green <br />Infrastructure. No overflow in 2 -year storm event. <br />• Design Bundle 4: CSO 056A &B and Lakeland. <br />Bundle 4: CSO 056A &B and Lakeland <br />• Construct LEWS 1150 (CSO 056B) -1155 (CSO 056A): Source Control, Green Infra- <br />structure, Relief Sewer, Regulator Modifications. Controlled to 0 untreated CSOs per typ- <br />ical year. <br />Construct LEWS 1180: Source control, relief sewer, storm sewer. No overflow in 2 -year <br />storm event. <br />Design Bundle 5: Remaining Minor Overflows. <br />4 <br />