My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9060-19 IWWIP Support
Document-Host
>
City of Lakewood
>
Resolutions
>
2019
>
9060-19 IWWIP Support
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 12:40:04 PM
Creation date
2/21/2019 12:21:26 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0City of Lakewood, Ohio <br />SCHEDULE <br />Integrated Wet Weather Improvement Plan I Phase 2 <br />Lakewood adopts the following schedule of IW WIP measures: <br />1. 2019 -2023 <br />• Continue all ongoing activities. <br />• Complete Atkins area private property pilot study and evaluate the cost - effectiveness and <br />prioritization of any private infrastructure requirements. <br />• Evaluate revised rate structure to include fixed -fee charge and /or impervious - surface <br />charge and credit or incentive regime. <br />• Complete West Clifton and other Regulator Improvement Projects. <br />• Complete $23 million High -Rate Treatment Facility for control of CSO 002. <br />• Complete design of Bundle 1: work for CSO 052 storage facility and aerial sewer. <br />• Evaluate land use requirements for CSO 059 control measure and related land use oppor- <br />tunities and existing facility investment. <br />• Complete IWWIP Update by December 31, 2022. <br />2. 2024 -2028 (projected) <br />■ Continue all ongoing activities (and any additional ongoing measures adopted in 2019- <br />2023). <br />■ Construct Bundle 1: CSO 052 storage facility RRES 1160 -1165: Aerial Sewer to Above <br />Ground Storage at WWTP. Controlled to 4 untreated CSOs per typical year. <br />Complete design work for Bundle 2: CSO 059 and related interceptor overflow storage <br />facilities. <br />■ Complete IW WIP Update by December 31, 2027. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.