My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9060-19 IWWIP Support
Document-Host
>
City of Lakewood
>
Resolutions
>
2019
>
9060-19 IWWIP Support
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 12:40:04 PM
Creation date
2/21/2019 12:21:26 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UI'i- <br />1 <br />City of Lakewood, Ohio <br />Integrated Wet Weather Improvement Plan I Phase 2 <br />4. Consistent with the Clean Water Act and Integrated Planning, Adaptive Management <br />of this IWWIP must be maintained. Adaptive management is necessary to leverage land <br />use changes, market opportunities, new technologies, changing affordability and access to <br />non -local sources of infrastructure funding. <br />In each five -year period, Lakewood will prepare an IWWIP update. As part of the update and <br />at other times, Lakewood will receive and consider public input, consistent with the Integrat- <br />ed Planning Framework. <br />5. All actions under the IWWIP must remain affordable and equitable. The IWWIP must <br />remain affordable for Lakewood's sensitive populations, especially the lowest quintiles. The <br />IWWIP must remain predictable to protect affordability and sustain private investment. New <br />rate structures and any systematic renewal of private infrastructure must be equitable. <br />With these priorities and principles guiding implementation, Lakewood's IWWIP and schedule <br />are set forth below for the next five -year period, corresponding to the schedule for Lakewood's <br />NPDES renewal schedule for 2019 -2023. The projected five -year schedule for 2024 -2028 is also <br />listed. All remaining IWWIP large capital measures to be implemented after 2028 are prioritized. <br />ONGOING IWWIP MEASURES <br />The following IWWIP measures are applicable in all five -year periods: <br />1. Lakewood will continue its ongoing investment to renew existing infrastructure, at its <br />WWTP and throughout the system, in an integrated and planned approach. <br />2. Lakewood will maximize land use opportunities and code enforcement for continued wet <br />weather improvement and green infrastructure development, consistent with the Community <br />Vision. <br />3. Lakewood will continue its ongoing investigation and iterative modeling and monitoring to <br />optimize system performance, prioritize capital investments and minimize risks of basement <br />backups. <br />4. Lakewood will perform periodic affordability analyses, no less than in every five -year peri- <br />od, to protect ratepayer affordability, especially the lowest quintiles of the population, in or- <br />der to keep the program sustainable. <br />5. Lakewood will perform Adaptive Management review of this IWWIP no less than every <br />five -year period in preparation for any five -year IWWIP update. <br />
The URL can be used to link to this page
Your browser does not support the video tag.