My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
minpw 03-02-20
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2020
>
Public Works
>
minpw 03-02-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 3:24:19 PM
Creation date
4/28/2020 3:24:09 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Public Works
Date
3/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Sequential Kinking Terminal(SKT-350)—Type E <br /> n, <br /> 1; <br /> http://roadsys:tems.c oi,n/sl<t.hti-nI <br /> Test Level: NCH RP 350:TL-2 and TL-3 <br /> Characteristics: <br /> • Tangent terminal. <br /> • Square impact front face. <br /> m Has a feeder chute(channel section that surrounds <br /> the rail)which,gets wider at the downstream end. <br /> ® <br /> Breakaway steel end posts#1 and#2 and standard <br /> steel guardrail pasts#3 and beyond. <br /> Rail has 3(1/2"x 4" long)slats in the valley of the rail. <br /> o There may be 5 additional slots(1/2"x 4" long) on <br /> both the top and bottom corrugations of the w-beam <br /> section,which makes it interchangeable with the <br /> FLEAT system. <br /> Cable anchor bracket is fully seated on the shoulder <br /> portion of the cable anchor bolts. <br /> All hinge steel past, plug weld steel posts,or wood <br /> posts avallable. <br /> ® End of'WW-beam rail with offset of O'to 2'-0". <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.