My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
minpw 03-02-20
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2020
>
Public Works
>
minpw 03-02-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 3:24:19 PM
Creation date
4/28/2020 3:24:09 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Public Works
Date
3/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Noir -Eiieigy soi-bittf,Tet°t�tltials <br /> ® Used for single runs of strong post w-bearer guardrail. <br /> o Redirection begins beyond the third post. <br /> Slotted Raid Terminal(SRT-350)—Type B <br /> http://www.hi hwaVgLiardraiii.com/piroducts/et-srt350,htmi <br /> Test Level: NCHRP 350,TL-3 <br /> Characteristics: <br /> + Flared terminal. <br /> • No impact head. <br /> • Longitudinalslots on w-beam rail element. <br /> • Strut and cable anchor bracket between posts#d.and#2 <br /> act together to resist the cable loads. <br /> • Slot Guards on downstream end of slots. <br /> • Steel and wood post options available. <br /> m Parabolic flare on wood post option. <br /> a Straight line flare on all STP steed post and HBA <br /> steel/wood post option. <br /> a Should be installed at locations where sufficient runout <br /> area exists behind and downstream of the terminal. <br /> o End of w-beam rail with offset of 4'-0" <br /> • `flood post option has 3'-O"to 4''-0"offsets. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.