ARTICLE A.5 COST OF THE WORK
<br />§ A.5.1 Cost To Be Reimbursed as Part of the Contract
<br />§ A.5.1.1 Labor Costs
<br />§ A.5.1.1.1 Wages of construction workers directly employed by the Design -Builder to perforr the construction of
<br />the Work at the site or, with the Owner's prior approval, at off -site workshops.
<br />§ A.5.1.1.2 With the Owner's prior approval, wages or salaries of the Design -Builder's supervisbry and k.
<br />administrative personnel when stationed at the site.
<br />(If it is intended that the wages or salaries of certain personnel stationed at the Design-Budder's:prirrc; 7&— or--of�her-1{ -l'�..
<br />offices shall be included in the Cost of the Work, identify below the personnel to be included, i Whether for all or only
<br />part of their time, and the rates at which their time will be charged to the Work.)
<br />Person Included ...... Status (full timelpart time) Rate ($0 00) Rate (unit of time)
<br />§ A.5.1.1.3 Wages and salaries of the Design -Builder's supervisory or administrative personnel engaged a factories,
<br />workshops or on the road, in expediting the production or transportation of materials or eq ipnTp required ftjr the
<br />Work, but only for that portion of their time required for the Work.
<br />§ A.5.1.1.4 Costs paid or incurred by the Design -Builder for taxes, insurance, contributions5 assessments` and benefits `...r:: r
<br />required by law or collective bargaining agreements and, for personnel not covered by such.:agreeme,nt-s ::.� io.rmary::..:..:: r:.: i......:
<br />benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, provided such costs are
<br />based on wages and salaries included in the Cost of the Work under Section A.5.1.1.
<br />§ A.5.1.1.5 Bonuses, profit sharing, incentive compensation and any other discretionary payments paid �one
<br />hired by the Design -Builder or paid to the Architect or any Consultant, Contractor or supplier, with:lie Oyper`s
<br />prior approval.
<br />§ A.5.1.2 Contract Costs. Payments made by the Design -Builder to the Architect, Consultant; Cgntrac .,,agid
<br />suppliers in accordance with the requirements of their subcontracts.
<br />§ A.5.1.3 Costs of Materials and Equipment Incorporated in the Completed Construction
<br />§ A.5.1.3.1 Costs, including transportation and storage, of materials and equipment incorporated or to be
<br />incorporated in the completed construction.
<br />§ A.5.1.3.2 Costs of materials described in the preceding Section A.5.1.3.1 in excess of those] actually it §talled;..t- r
<br />allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Own" er's property*' the
<br />completion of the Work or, at the Owner's option, shall be sold by the Design -Builder. Any amounts realized from
<br />such sales shall be credited to the Owner as a deduction from the Cost of the Work.
<br />§ A.5.1.4 Costs of Other Materials and Equipment, Temporary Facilities and Related Items
<br />§ A.5.1.4.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials,
<br />supplies, temporary facilities, machinery, equipment and hand tools not customarily owned`y corstructtor work:rs..
<br />that are provided by the Design -Builder at the site and fully consumed in the performance of the Work. Costs of
<br />materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed:shall bye baste:
<br />on the cost or value of the item at the time it is first used on the Project site less the value of the-Yfem whgn zt s no
<br />longer used at the Project site. Costs for items not fully consumed by the Design -Builder shall mearflair market r
<br />value.
<br />§ A.5.1.4.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by
<br />construction workers that are provided by the Design -Builder at the site and costs of transportation, installation,
<br />minor repairs, dismantling and removal. The total rental cost of any Desi Builder-owned'item ma not exceed the
<br />purchase price of any comparable item. Rates of Design -Builder -owned equipment and quantities of equipment shall .::....
<br />be subject to the Owner's prior approval. x..:v:v,:.,.....
<br />AIA Document A1415� - 2014 Exhibit A. Copyright O 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This
<br />AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" 8
<br />Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible
<br />under the law. This draft was produced by AIA software at 06:51:30 ET on 04/14/2020 under Order No.6771434791 which expires on 03/06/2021,
<br />and is not for resale.
<br />User Notes: (1345484614)
<br />
|