My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-26 - Approve Design Build of Cove Church
Document-Host
>
City of Lakewood
>
Resolutions
>
2020
>
2020-26 - Approve Design Build of Cove Church
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 9:36:22 PM
Creation date
9/28/2020 7:00:26 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
Number
2020-26
Date Adopted
9/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that <br />comprise the Sustainability Plan by title, date and number ofpages, and include other identifying information. The <br />Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; <br />implementation strategies selected to achieve the Sustainable Measures; the Owner's and Design -Builder's roles <br />and responsibilities associated with achieving the Sustainable Measures; the speck details about design reviews, <br />testing or metrics to verb achievement of each Sustainable Measure; and the Sustainability Documentation <br />required for the Project, as those terms are defined in Exhibit C to the Agreement.) <br />Title Date Pares <br />Other identifying information: <br />§ A.3.1.7 Deviations from the Owner's Criteria as adjusted by a Modification: <br />§ A.3.1.8 To the extent the Design -Builder shall be required to submit any additional Submittals to the Owner for <br />review, indicate any such submissions below: <br />ARTICLE A.4 DESIGN -BUILDER'S PERSONNEL, CONTRACTORS AND SUPPLIERS <br />§ A.4.1 The Design -Builder's key personnel are identified below: <br />(Ment fy name, title and contact information) <br />.1 Superintendent <br />.2 Project Manager <br />.3 Others <br />§ A.4.2 The Design -Builder shall retain the following Consultants, Contractors and suppli <br />(List name, discipline, address and other information) <br />AIA Document A1411K - 2014 Exhibit A. Copyright © 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" 7 <br />Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible <br />under the law. This draft was produced by AIA software at 06:51:30 ET on 04/14/2020 under Order No.6771434791 which expires on 03/06/2021, <br />and is not for resale. <br />User Notes: (1345484614) <br />
The URL can be used to link to this page
Your browser does not support the video tag.