My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
mincow 04-11-22
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2022
>
Committee of the Whole
>
mincow 04-11-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 2:30:11 PM
Creation date
4/21/2022 2:30:01 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Committee of the Whole
Date
4/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In order to identify additional cost-savings, each project component was analyzed. The garage <br /> was identified as a major cost driver. In order to save money, the underground portion was <br /> moved above-ground, which reduced the number of residential units. The office space <br /> component was also identified as a challenge. That challenge was mostly addressed when <br /> Roundstone approached the project team and expressed interest in owning its own space in the <br /> building. <br /> Mr. Sobczak walked through the project facts and figures (attached here), highlights of which <br /> include the following: <br /> • 204 residential units, with an average 863 square feet and average rent of$1,857. <br /> • 11,000 square feet of commercial space in the "Roundstone"building and another 13,000 <br /> square feet in the Curtis Block <br /> • 504 total parking spaces <br /> • Total project cost of$81,875,000 with a $17,875.00 gap to be potentially filled with tax <br /> credits, grants, TIFF and/or low-interest loans <br /> Mr. Sobczak discussed the parking spaces and for whom they are reserved. Cleveland Clinic is <br /> owed 75 spaces through previous agreements. These spaces, plus the 240 for Roundstone will be <br /> available to the public evenings and weekends. The public will have access to 85 spaces <br /> Councilmembers inquired about the 75 Cleveland Clinic parking spaces and wondered if all <br /> spaces were needed by Cleveland Clinic. They suggested approaching Cleveland Clinic to find <br /> out about their current needs. Director Leininger explained that that has not yet been done and <br /> would require reopening the previous agreement between the City and the Clinic. <br /> Councilmember Bullock emphasized the magnitude of the opportunity at the site to spur <br /> reinvestment. He questioned whether the project is so constrained by financial considerations if <br /> there is room to make adjustments. Mr. Sobczak responded that there may be room to add <br /> additional for-sale residential options and other residential options but that the site can not absorb <br /> any additional office or retail space. He added that the current version of the site does not include <br /> detailed design decisions that have yet to be made. <br /> In response to a question, Mr. Sobczak confirmed that the project gap takes into consideration <br /> the affordable housing component. <br /> In response to a question, Director Leininger explained the process to bring the site to grade. He <br /> stressed that this is important to do as soon as possible for reasons related to the contamination <br /> and treatment of the groundwater and rain water at the site. The City had originally budgeted <br /> $1.5 million out of the Lakewood Hospital Fund to pay for site grading. A modified plan <br /> anticipates less than this amount. These costs are separate from any of the financials associated <br /> with the project and will be borne by the city <br /> Councilmember Kepple advocated for housing on the site to accommodate families with school- <br /> aged children. She referenced the recent joint meeting of Council and the Board of Education <br /> where both bodies discussed the challenges of keeping kids in the district and how housing is one <br /> of those challenges. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.