Laserfiche WebLink
M.V. ORDINANCE N0. 82- 97 <br />Page -2- <br />General Engineering Projects - Schedule I(cont'd.) <br />Pumping Stations <br />Railway and. Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfrorit and Terminal Improvements <br />Water, Sewage and 2ndustrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule I <br />Cost of Construction: <br />$100,000 - <br />$100,000 - $500,000 <br />, . <br />$500,000 - $1,000,000 <br />$i,ooo,ooo - $5,000;000 <br />12Q/, <br />Base Fee of 12% of $100, 000 <br />Plus 7.5% of amount over $100,000 <br />Base Fee of 8.4% of $500,000 <br />Plus 6% of amount over $500,000 <br />Base Fee of 7.2Q/o of $1,000,000 <br />Plus 5.8% of amount over $1,000,000 <br />General Engineering Projects - Schedule 2 <br />Street Resurfacing <br />Miner Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Lariding Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots, <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coa1, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$100,000 <br />$100.,000 - $500,000 <br />$500,000 - $1,000,000 <br />$1,000,000 - $5,000,000 <br />9% <br />Base Fee of 9% of $100,000 <br />P1us 6%Q of amount over $100,000 <br />Base Fee of 6.6% of $500,000 <br />Plus 5% of amount over $500,000 <br />Base Fee of 6.0% of $1,000,000 <br />Plus 4.9% of amount over $1,000,000