Laserfiche WebLink
fill material if necessary, .reseeding; la~:ms and x•eplacan~; trees anti shrubbery <br />dam~:~Led by Contractor and all appurtenant work incidental tY.ereto* <br />(b) &~C1i1~I~,L i~S~.T ~~,It1L: Only fine earth, slag or bank sand shall be used for <br />baclcfillir~g along the sides of the sevrer, and to a height of twelve inches (]_2") <br />over the top of the sewer. Should, in the opinion of the Tn€;ineer, the mater~_al <br />excavated from the trench be unsuitable for backfa_llin~; immediately ove.~ the scrrrer, <br />the Contractor shall, at his own expense, secure suitable material from other <br />sources. The backfiring material shall be brouht up evenly on bath sides of <br />the sewer and thoroughly compacted by tam~~ing or ranL~:in~• before any dutiznan~; from. <br />cars or buckets is permitted. <br />All baekfilling must be laid in horizontal layers, of a depth required by t;ie <br />Engineer, and thoroughly compacted by rnethod.s satisfactory to the Engineer. ido <br />pieces of rack larger than one (1) cubic foot in volu,ne shall be used in backfill, <br />and all rock particles used in backfill shall be entirrly surrour_ded by fine <br />material. If ordered by the Engineer, the entire trench shall be Huddled by <br />floodin€ with water from a fire hose or conducted along the se;;Ter trench by means <br />of a ditch, excavated fo.r that puxpose, or by <~:.ddJ.tion of ~,vater during--; back- <br />filling. , <br />No backfilling shall be made duran~; freezing; vre~y.ther except by permission of <br />the En€;ineer, and no fill shall ~e made when. the material. already in the trench <br />is frozen, nor shall frozen r~iaterial be used in backfil_ling. <br />(c) S~-1ND B!;CKFILL: tiJher:.~ ordered by the Engineer, the excavated material shall <br />be removed from the site of the vror..c anal bank sand cor_taan~ing not more than ten <br />percent (10;0) by weight of loam or clay and. free f:ccm all delet~ar-i o:zs or ob- <br />jectionable material shall be us4ect for baclcfillin;;. If rea~v.i~°cd, this sand <br />ba.clcfill shall be tho-rou~hly compacted by tatnpin~:• in layers of not more than six <br />inches (6" ), or by flooding, as may be directed by 'tn2 ;~,r~€,ineer. Sand for bacl{- <br />fill, when ordered by the Engineer, ~^rill be n_aid for at the contract price set <br />forth in the proposal. <br />8. DISPOS~~L Or SiJFtPL~J~~ SXCi~V_,T'" l;i.`i"F.,R.T:~L: <br />l~l.l surplus excavated material shall be removed and de~?osited upon lands <br />abutting the irnprovemcnt if such fill i s requested by the property owners . If <br />no filling; of. a'outtin~:: ~,:~roper-t~ is desired, the Contractor shall dispose of such <br />surplus tivherc:ve-r he can arrange for ri;irts to fill. <br />Uril'411d.i~G; OF in ~1rC11~S <br />The sevrer trench ;;Lest in all cases be 1_ept substantially free from storm, <br />surface and subsoil i~rater or sewage, so that all ,nasorlry grid ioint.s may have <br />ample tame to set and harden. liio ,joints shall be made undFr :rater. If neces- <br />sary to accoz~iplish this, in the o.~~inion of ~t.he rnr°ineer, the Contractor shall_ <br />fill the bottom of the trench v~ritn a three i ~rcl: (3") laver of c.rush:;d s1aF, or <br />stone screenings and install a tilt' nnderdrain, E'.(ii.L+eCLdeC1 on x.7,1_ sides in not <br />less than three inches (3") of crushed slag or s~l;one screen_in~~s. !~11 joints of <br />this drain. shall be covered vrith si:r~~_ps of burla1~ or other cl.o-tYr of proper <br />porosity. This work shall be paid for at the ?rice bid for same only Then in- <br />st~.lled upon the v~ritten order o_f_ t11t; ~nE ineer. <br /> <br />X11 manholes shall be built in ~accorclance v:itii co:~structaon plans on file <br />at the office of t~~e Ln~~ineer. `f~ie~; sir.ll be b~_t' J:t of 1_~2" ~: ~." y 3 l~?_" <br />shale brick laid ir_ Portland cei~~.snt r"!or':.~ar zrith br:ic.-tis :;.rrrnE,ed radiall;T as <br />S - g <br />