Laserfiche WebLink
caused by the Contractor's operations. In case leakage is siloti^rn by the 'test, <br />the Contractor sha11 have same repaired at his ovm expense. <br />22. hI)DITION~L (~ONCR:li'T~: <br />tiVhenever in the pp~,niorz of the Engineer additiorta7. concrete lis required aver <br />ar_d above that z~eau.~.z'ecl 'oy t'ne plar.,s or specified elsewhere herein, kIe racy order <br />the Contractor ~p tr~stall or place additional. concrete and vrh:n so ordered; same <br />shall be placed arld paid for under the item fox° "additicnal concrete" . <br />23: CL~1wRING STkI~ aT, CL?~~~rgI:NG UP %~ISll ?Zi?~P~~II?S <br />The Contractor shall 'remove surf:I.us excavated material_ o_r construction <br />tuateria]_s as the work proY.:resses, and sha11 keep tY~e street in a safe and con- <br />venient condition for travel. <br />Before final acceptance o.f the tivorl:, t:he Contractor sha11, by means of a <br />drag or by flushing, as directed by the "r;ngineer, cZ.ear the se~,~2rs of any t~iortar, <br />bituminous compound, dirt or other refuse that tray have been left or accumulated <br />in the setivers. 11,_11 m~:nholes, inlets ar~d other structures shall be cleared of <br />all 'forms, scaffolding; centerin4, surplus r:~~oi•tar, rubbish or dirt, ~tnd left in <br />a clean and rroner condition; <br />X11 surplus material, feels, eq~zipment and temporarj; builc:in€;s shall. be <br />removed from the site of the work; and all street surfaces, ~;ntters, •wal'xs; <br />lawns rights-of-way or ether property sha11 be restored to as good a conditior_ ' <br />as originally found. <br />the Contractor; at his ov^rn exrensey shall repair any and all damage Yte has <br />caused to the street or adjoining property and shall save free and harm7.ess the <br />principal in this contract froth all suits far damages to persons or property <br />arising from or caused by tY~is constz•uetion. <br />24. REST "iR~:T1:f~,1 CE SIDE:~~:~LKS, CURijING ~~?D F~VII'3G: <br />.~11 pavements, road surfaces; sidewalks; ~,ari~eways or curbs i^.~hich the Con- <br />trartor is required -to replace sla1T; at the expiration o~F the period of main- <br />tenance; be replaced in the same manner as the ori~,inal installation or as <br />speci.~'ied lj~r the i;tzgineer and the cost of sucl~z replacement sY_all be borne by the <br />Contractors unless otilerv~~ise suecified. <br />?5 ~ F1Al1~L REP~~IRS <br />tour (1)) months after the final measurements have been tacen, the Engineer <br />shall make an examination of all surfaces t;rnc~re setnrers have been con;5tructed, <br />and shall note any depressions due to breakz~e, settlements, tivasltouts or other <br />causes that may be attr-ibutecl to the construction of set~rers. Ut~an written order <br />from the En€,ineer., ,the Contractor shall af~:a~.t~i ro ovE~_e~ tae urork and r~;pair breaks, <br />refill depressions, remove any surplus th~;t has p-rev9_ous]_~,T been left ~zpon the <br />trencYtes, or make other repairs or re??lacentents ~c;l~~i.ch are necessea~y to place <br />all the work in first class corictiti.on. <br />26 . Iv'ilis~StTR.~l = :~1v T it'Ol~. r'.1~r),; _~,i':~ T <br />(a) G~~1'a~~~1L: The cont.rU.ct price per u:~it of stor,;t seVVer, sanitary sewer, matl- <br />holes, catchbasins, curb caYtr:ections, etc., is for the completed work, regardless <br />of. the character of material c~ncoun.tered in the excatrati.on or canting;enr.i:tis of <br />__ any other nature. <br />s - 14 <br />