caused by the Contractor's operations. In case leakage is siloti^rn by the 'test,
<br />the Contractor sha11 have same repaired at his ovm expense.
<br />22. hI)DITION~L (~ONCR:li'T~:
<br />tiVhenever in the pp~,niorz of the Engineer additiorta7. concrete lis required aver
<br />ar_d above that z~eau.~.z'ecl 'oy t'ne plar.,s or specified elsewhere herein, kIe racy order
<br />the Contractor ~p tr~stall or place additional. concrete and vrh:n so ordered; same
<br />shall be placed arld paid for under the item fox° "additicnal concrete" .
<br />23: CL~1wRING STkI~ aT, CL?~~~rgI:NG UP %~ISll ?Zi?~P~~II?S
<br />The Contractor shall 'remove surf:I.us excavated material_ o_r construction
<br />tuateria]_s as the work proY.:resses, and sha11 keep tY~e street in a safe and con-
<br />venient condition for travel.
<br />Before final acceptance o.f the tivorl:, t:he Contractor sha11, by means of a
<br />drag or by flushing, as directed by the "r;ngineer, cZ.ear the se~,~2rs of any t~iortar,
<br />bituminous compound, dirt or other refuse that tray have been left or accumulated
<br />in the setivers. 11,_11 m~:nholes, inlets ar~d other structures shall be cleared of
<br />all 'forms, scaffolding; centerin4, surplus r:~~oi•tar, rubbish or dirt, ~tnd left in
<br />a clean and rroner condition;
<br />X11 surplus material, feels, eq~zipment and temporarj; builc:in€;s shall. be
<br />removed from the site of the work; and all street surfaces, ~;ntters, •wal'xs;
<br />lawns rights-of-way or ether property sha11 be restored to as good a conditior_ '
<br />as originally found.
<br />the Contractor; at his ov^rn exrensey shall repair any and all damage Yte has
<br />caused to the street or adjoining property and shall save free and harm7.ess the
<br />principal in this contract froth all suits far damages to persons or property
<br />arising from or caused by tY~is constz•uetion.
<br />24. REST "iR~:T1:f~,1 CE SIDE:~~:~LKS, CURijING ~~?D F~VII'3G:
<br />.~11 pavements, road surfaces; sidewalks; ~,ari~eways or curbs i^.~hich the Con-
<br />trartor is required -to replace sla1T; at the expiration o~F the period of main-
<br />tenance; be replaced in the same manner as the ori~,inal installation or as
<br />speci.~'ied lj~r the i;tzgineer and the cost of sucl~z replacement sY_all be borne by the
<br />Contractors unless otilerv~~ise suecified.
<br />?5 ~ F1Al1~L REP~~IRS
<br />tour (1)) months after the final measurements have been tacen, the Engineer
<br />shall make an examination of all surfaces t;rnc~re setnrers have been con;5tructed,
<br />and shall note any depressions due to breakz~e, settlements, tivasltouts or other
<br />causes that may be attr-ibutecl to the construction of set~rers. Ut~an written order
<br />from the En€,ineer., ,the Contractor shall af~:a~.t~i ro ovE~_e~ tae urork and r~;pair breaks,
<br />refill depressions, remove any surplus th~;t has p-rev9_ous]_~,T been left ~zpon the
<br />trencYtes, or make other repairs or re??lacentents ~c;l~~i.ch are necessea~y to place
<br />all the work in first class corictiti.on.
<br />26 . Iv'ilis~StTR.~l = :~1v T it'Ol~. r'.1~r),; _~,i':~ T
<br />(a) G~~1'a~~~1L: The cont.rU.ct price per u:~it of stor,;t seVVer, sanitary sewer, matl-
<br />holes, catchbasins, curb caYtr:ections, etc., is for the completed work, regardless
<br />of. the character of material c~ncoun.tered in the excatrati.on or canting;enr.i:tis of
<br />__ any other nature.
<br />s - 14
<br />
|