My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1957 566 Ordinance
>
Mayfield Village
>
Ordinances Resolutions
>
1954-1957 Ordinances
>
1957 566 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:52:00 PM
Creation date
8/6/2018 9:49:13 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
566
Date
3/18/1957
Year
1957
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(b) SEtd,RS: The number of lineal feet of sev~rers, including excavations and <br />backfill, trJ be paid for under their respective items, shall be the actual <br />number of lineal feet of each class and size, rneasuri;ci continuous]_y slang t;he <br />center line o>; the se~y~rer thru manholes and "Y" branches. <br />Such payment shall. inc]_ude all items of expelise except such i~;;ms ~.s -tire <br />stated in th-a spoci~'~,cations to rLave separate pa~~rm:nts. T~t11en a sevrer ends at a <br />manhole, measureln.ent sh.~,;Ll be made t~ th~ center o~: tl~e manhole. xt all points <br />where severs chanz;e sire, the measurc;:rent for each size sha11 be maclc- tq tY;e <br />center of the manhole tivhere the change is made. Sewers vrill not be paid for <br />thru special structures. <br />(c) Y-BRAI~iCFi:~S, Y-CO1Q~!:` ~CTI:OTJS ir~D SL=_3~•iTS: The number of branch connections of <br />each t~,Tpe and size to be paid. for ll:nder^ tl.eir respective items shall be the <br />actual number of such connections installed in the ti+rorlc. ~a~hen Y-branchss or <br />slants require ex..tensions to clear tha sides of "the concrete bedding,, the cost <br />~f such extensions shall be included. 7_I? the 21x•:ice bid :for each Y-branch or <br />slant. The cast of concrete supports for Y-iranches and sl_<:~nts shall 'oe in- <br />cl.uded in the contract unit price .roc 1:•hesc~ items. <br />(d) RISi~RS: The number of line~il feat of vitrified pine risers to be paid for <br />at the contract trice, shall be the actual nuirioer of lineal feet of vertical <br />risers installed, measured f~^om the be]_1 end o' the Y-branch or s]..ant at the <br />sewer, along. the center line o.f the pipe, includinC; any intermediate benas; pro- <br />vided, hov:*ever, that any eltension of slant or Y-branch td clear concrete as_ <br />noted above will be considered as slant or Y=branch and not paid for a€;a in as <br />riser. The cost of concrete encasements for risers shall be included in the <br />contract Izriit price. per lineal foot of -riser. <br />(e) n:uTvfiC)LES: Th.e nuric~er of manholes of each type to be paid for under their <br />respective items, shall be the actuz~l numl;er of manholes of each t.;Tne installed <br />in the 1^rork. including: cast iron f_raraes, ccvers, steps, excavat:ton and baclcfiL_. <br />(f) SH~~~TIG i71iD_:.N,_~~1] L~li'T Ill i~IuiC_]: Tl•Ie a_aoun-t of sheetin;• in thousa-r~d feet <br />board measure to be paid for at the contr~I.ct ;:rice, shall. be the amount actual.l;- <br />left in place by the Contractor upon ox•c^or of t?~~e ~nt;_ineer. In no case tivill <br />capping, bracing or sl~eetinl• used ire. tunnel con:tr,~ct:i.or2 be paid for as sheeting.. <br />(g) TI,;i>3~ft C?RII^l,~`iCT1~: The am:aunt o.f tir:Iber r;rilla~•e in thousand, fe.:t board <br />measure to b° paid for a.t the contract price, small be the ai:i~unt actually ~_n- <br />stalled ~.n the trench by the Contractor u.poiz oraer of th.e En~;inee.r. In no case <br />will capping, bracing; or sheeting used in t~xr,x_el construction bo paid for as <br />grillage. <br />(h) TIL:~~ U!~TDLR.C.~1?.~lr~: The number of 1_i_neal. feet oi' ti]_e urde~°d.raiil to be paid <br />for at tl~~e contract price, shall. be tl~e number of lineal f^a~t of such underdrain <br />actually installed in the' ~rrork upon v;r_i_tter or.•urr o:L the Engineer. <br />(i) Cr!TCr I3~';SIA;S 1~7D iI4L`t~~TS: The number of cc~tc:r~basins and in]_ets to be paid <br />for at the respective contract prices s'r~a11 be the actual number of each insta]_l- <br />ed in the work, ilZCludin~• cast iron frar;tes, ,rates, e~c~cav;~tion and backfill. <br />(j) CiiTCflB:=,SIi ~ COi~I`!'~CTTOI~S : The number o]" la.neal feet of catchbasin connections <br />to be paid for at the contract price shat.]. b:. the actuall.. nu~~Iber of Lineal :feet <br />of such connections installed, ine]_udinl --=xcav~I.ta.on aid uarl•:f'ill_, Ine~asured from <br />the center line of manhole to the cc;n.te;r 1i.ne of catchbasin or inlet. <br />The cost of concrete encas:;InE:nt or be:cld:inF; i'or catchbasin con.lnctions sha7.1 <br />be incluaecl in the contract unit price per lineal foot of catchbasin connection. <br />s - ~.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.