Laserfiche WebLink
(g) P~lYi'~~~I~TS : In mai~ing payments under this contract, quantities <br />will be estimated from the actual measurements of the Engineer. Tt is <br />agreed and understood that the quantities shown on the bid blank are <br />approxiii?a.te only arld are used primarily to compare unit prices submitted <br />by all bidders and. that such quantities as shown on bid blank may be <br />increased or decreased as the principal under tizis contract r•~ay elect. <br />IJo labor or n~.aterial furnished outside of the provisions of this agree- <br />ment shall be paid for unless the same has been done upon vuritten order <br />of the Engineer. <br />On or before the first vreelc of each ?nonth the Contractor shall <br />furnish the .engineer v~~ith a statement of the approximate estimate of <br />the vrorlc vrhich has been done in conferri?ity vrith these specifications. <br />i~'lhen the engineer has cYleclced_ this estimate a,r_d. d.eterminee~ the total <br />amount of tiaorlc performed, this ar:iount, less ten percent (10~) shall be <br />due the Contractor after deducting; all previous ectir^~a.tes. Payment <br />for partly corupl.eted. v~orlc, and for r~iaterial delivered: to the site and <br />not installed in the vrolYt, vrill be paid for• at a price which, in the <br />judge?nent of the Engineer, rpresents the cost to the Contractor for <br />such wo rk. <br />Ten days after the final measurements have been made and af_~ter <br />acceptance by the ~~~n~;ineer and the City of Cleveland-, Division of ':later <br />and Heat, the Engineer shall submit the final estimate in full for all <br />vrorlc performed; fro?u which esti?nats, ho`.~evcr, there shall be deducted <br />5;~ of the entire amount vrhich shall be retai.~.z~d for a period of 4 months. <br />At the expiration of the 4 ,nonth period, the Contractor shall refill any <br />depressions or remove ar_y ~:urplus from the street ~~r~cl clean and repair <br />any pat t of the work under. this contract. ?Jpon the con?pletion of such <br />work to the satisfaction of 'the Engineer, 3 of 'the total contract amount <br />shall be paid to the Contractor, The remaining tyro percent (2`~) clue the <br />Contractor sha.a.1 b ~ retair~d fox' an adc~.itional period of twenty (20) <br />months; as a guarantee upon the part of the Contractor that the work <br />vrill rem.~~.in in gocd sound condition. <br />If any o ~.' the ?~~rorl: done u.rder this contract shall, in the opinion <br />of the ngineer, require repairs, replacements, cr backfillings, the <br />Contractor agrees to furnish all materials and d.o all such ~rrork at his <br />own expense. Should the Contractor fail to do so v,~thin a reasonable <br />time after notification, the .iJnginaer shall Y;ave such work done and the <br />cost of same paid out of the above t~~ro percent (2°'~) guarantee fund. <br />Should the cost exceed this sum the Contractor agrees to pay the amount <br />of the excess. <br />(h) STr:TE IidDUSTii.1~=~ L C0 '.t~ItiS1~TI0t~T: The Contractor shall. at all <br />times during the term of tYii s agree~rent subscribe ~to and comply vrith <br />the vrorlcrren ~ s compensation la~,vs of the State o.f Ohio and pay such <br />premiums as may be required thereunder and to save the principal under <br />this contract harm7.ess from any' a.nd all liabi]_ity arising; from or under <br />said act. 1-Ie sha1.1 a7_so furnish at the time of delivery of this con- <br />tract and at such other times as may be .requested, a copy of the official <br />certificate or receipt shoti~ring the payments Yzereinbefore referred to. <br />-16- <br />