Laserfiche WebLink
Sec. 1.8 ~~DDTTI~~t~IAL COT~,CR.ETE: <br />?7henever in the o~.~inion of the Engineer addi•Li.onal concrete is <br />required over and above that required by the plans or specified else- <br />;~:~here heroin, he rnaVT order the Contractor to install or place additional <br />concrete and ti~rhen so ordered same shall be placed and paid .for under the <br />item f'or "additional concrete" . Ccncrete shall confor. m in all_ xespects <br />to Class " ~'" , Ohio State Department o~ Hi~h~rray Specifications . <br />Sec. 19 CL!~~lltlP•~?G STP~i~lT .jN~ R,P11Ii~S: <br />(a) G`,~:PT~tAL: Upon completion of backfillin#t, or at such other <br />~ti.me as ordered by ~;ngineer, Contractor shall. remove from sate of work <br />a11., surplus material, tools, equi.p~aent aiid. construction sheds. All <br />surplus excavated material slia]_1 •be removed and deposited upon lands <br />abutting improvement if such fi1]_ is rcgv,~~stc,d. by prc~~~eNty owner. If <br />no :Filling of abutting property :i_s desired. the Contra.ci.,:,~~ shall dispo e <br />of such surplus V.*herever he carp arrange for r~~_gnts ~•o fill. The sur- <br />face of street shall be lift smooth. <br />(b) Ri~I'~ .RS : The Contractor, at his aTrrn expanse, shall repair any <br />and all d.arnage he has caused to the stree~i o_~ adjoiiii_l~; p:.~c?~erty and <br />shall save :Free and liarmless •the principal in th_ s coni:,l•::c:, :Cr~~m all <br />sua_ts for damages to persons or property arisin; from or causeo. ?~y this <br />construction. <br />Sec. 20 RI;ISTORi~TTOi,I Ot~' S:! ~i?,'~;1~_LIt~, GUI~r3Ii+IG t~i~~ P~~TIA;G : <br />All pavements, road sur~'accs, :sidewalks, dr.ivev;ays or curbs which <br />the Contractor is rectui.red to replace shall, at the exp:i_.rati.on of the <br />pF.;~ri_od of maintenar~ce9 be replaced in the same manner as the original <br />installai;ion or as s1,s;;cif1_Ed b~- the Engineer and tho post of such re- <br />pJ_acement sha:1J_ be borne bpi the Contractor, unless otLEr~sise specified. <br />Sec. 21 FII~%iiL .tZ~~,1:~11~.5: . <br />Pour (1;) months after the final_ ;neasurements have been taken, t'e <br />Engineer shall mal;.e an examination o:F all surfaces ,~:~here water mal.iis <br />have been constructed, grid sl~iall note any depressions due to brealca€;e, <br />settl.erlents, z~rashouts or other causes that m~.y be attributed 'tv 'the <br />construction of z~rater mains . Upon vrritten order from the Engineer, the <br />Contractor shall again go over the zrorlc argil repair breaks, refill de- <br />pressions, r~m.ove any surplus that has previot~sl.y been l.ef't upon the <br />trenches, or !~2alte other repairsor replacements ~~.hich are necessary to <br />place all the rro-rk in first-class conclition. <br />Sec. 2.2 i:ic,rlSUItEi~~u~I~iT :i~'0'.ti ?AYl ~ ~ i~iT , <br />(a) GEI~I,L`~L: `.I'he contract price ter unit of water main, line <br />valve, hydrant, fitting or special, etc., is for the completed work, <br />regardless of the ;.haracter of material encountered in the excavation <br />or contingencies of any other natur. e . Tn measuring the main. line and. <br />hydrant connect:i.ons fo-r final estimate no deductions ~~:.i1J_ t,e made by <br />reason of val~res, tees, crosses, bonds, offsets or special f'Ltisings <br />in such li nes . <br />-11~- <br />