My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1963 825 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1961-1964 Ordinances
>
1963 825 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:52:57 PM
Creation date
8/7/2018 6:20:10 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
825
Date
12/16/1963
Year
1963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of trench shall be ?zot more than two feet (2 ~) p;reatcr than diameter of <br />pipe except by consent of the Engineer. <br />(b) pTpg I~'OUATD_1`rI01V: i.inless otheruvise specific;d the trench shall <br />have a flat 'oottom conforming to grade, so that the barrel of piI%e shall <br />have full bearing throughout itsleng th. If subgrade is soft and cannot <br />support the pipe the objectionab7.e subgl~ade material shall be removed and <br />replaced ti^rith ;suitable fine earth or bank sand. thoroughly compacted, all <br />at Contractors cost. -any part of the trench excavated be].oiw grade sha11 <br />be corrected ~^~~ith approved ria~bc:r:i_a.l thoroL~.~;hl~T compacted.. <br />(c) PIPE CL'~.:1R.~11`TCE Tid i~.OC li: Ledge rock, boulders, tarp;e stones and <br />shale shall be removed -to a clearance of at least six inches (6") below <br />all. parts of tl~e pire~ valves or fi~tt~~..r?gs ~ and to a clear .^~2dth of six <br />inches (6") on each s~_de of all concrete pipe and a~opurtenances, and. nine <br />inches (9") of cast iron and. steel pipe and appurtenances shall be pro- <br />vided. ;excavations belovr sub~;rade sl_a11. be refilled to subgrade ti^rith <br />fine earth or bank sand thorouz;hl.y compacted, all at Contractor's cost. <br />(d) 13L~1STIid(i t'B.OCEDUP~ : Blasting for exravatio~ . Zar1:Ll be permitted <br />only after securing the v:~itten apl:lroval from the ~n:i na~-r 1^d110 shall f~_x <br />the time d.urinr; ~-rhich blasting may be done a.nd ~rahat pro, E?ct~.ve measures <br />must be used to insure safety to adjacent properi;i~ e The ~o,t,ra.ctor shall <br />be responsible for any damage resulting from -tx~a.z~; ~~rting~ ,~-„o:c•age or use <br />of explosives in blasting. The Contractor's metho7. c:f proc~•d~.tre relati~Te <br />to blasting sha11 conform to State .laws and to local i~.iuniripal ordinances. <br />(e) BELL HGL~~,S 1~1;~I1Lt~D: Bell holes of ample dimensions shall be <br />dug in earth trenches at each joint to permit the jointing to be made <br />properly. lldequate clearance for properly jointing pipe in rocl: or shale <br />trenches shall be :provided at bell boles. <br />(f.) BTVIC~ETi .1~1) SII~JiJT~~B '1"izr~TCi-iES: t~:llerever necessary to prevent <br />caving, excavations in sand., ;ravel, sandy soil, or other unstable <br />material shall be adequately sheeted and braced. ~:lhere sheeting and <br />bracing are used, the trench 1°rldth shall. be increased accordingly. <br />Trench sheeting shall. remain in place until pipe has been laid, tested <br />for defects ar~i repaired, if necessary, and the earth around it compacted <br />to a depth of one foot (l~) over the top of the pipe. Sheeting left in <br />trench by order of3nF;ineer ,,rill be paid for at price bid per thousand <br />( Tvi) feet . <br />(g) pF;~lIiVE1GE: The Contractor shall, tivhen ordered by Inspector, <br />construct tight b~,llcheads across trench and provide pumps suitable for <br />the removal of any water which may be encountered or ~r~hich may accumulate <br />in the trenches. In no case shall trench water be permitted to rise upon <br />or flOFr through tl~.e t,.rater main. <br />(h) EXISTIi~TG ':i~l^1;;1~. COU73.SES: In open vrater courses, ditches or pipes <br />encountered during; the: progress of the ~^ro.rk, the Contractor shall at his <br />o~ron expense provide for the prctection and securing of a continuous f1cUr <br />in such courses or pipes and shall repair any damage that may be done by <br />reason of them. <br />(i) 1?,OkD Si1R?LCES, CUFu3Il~TG, DRIVE1711YS ~~ID SL~);l~~r~LKS: ^1he Contractor <br />shall remove all pavements, road surfaces, curbing, driveways and side- <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.