My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1968 1044 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1968-1970 Ordinances
>
1968 1044 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:56:59 PM
Creation date
8/10/2018 10:50:33 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
1044
Date
1/15/1968
Year
1968
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
//J <br />- 2 - <br />Power Plants Water Intakes and Sewage <br />Pumping Stations Outlets <br />Minimum Fees - Schedule 1 <br />Cost of Construction <br />$ 100,000 --------- 12.0% <br />$100,000 - - 500,000 --------- Base fee of 12% of $100,000 <br />Plus 7.5% of amount over $100,000 <br />500,000 - 1,000,000 --------- Base fee of 8.4% of $500,000 <br />Plus 6`/, of amount over $500,000 <br />General Engineering Projects - Schedule 2 <br />Minor Roads and Streets in <br />Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining i-falls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and <br />Elevated Storage Tanks <br />Water, Coal, Oil and Gas <br />Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction <br />$ 100,000 --------- 9% <br />$100,000 - 500,000 --------- Base fee of 9% of $100,000 <br />Plus 6% of amount over $100,000 <br />500,000 - 1,000,000 --------- Base fee of 6.6% of $500,000 <br />Plus 5% of amount over $500,000 <br />Sec. 2c. If, after the plans, profiles, specifications and estimates <br />of costs for work authorized and approved by the Council have been prepared by <br />the ENGINEER, the proceedings for such work is abandoned, or is postponed <br />for a period of more than six (G) months, or the actual construction of such <br />work is not commenced within nine-(9) months after the date of delivery of said <br />plans, profiles, specifications and estimates of cost, then he shall be paid <br />forthwith a sum equal to seventy-five percent (75%) of the fee stated in Sec. <br />2b, based onthe total estmated cost of said improvements, as full compensation <br />for all work done up to that date upon the subject project. In the event the <br />proceedings for such work so abandoned, or postponed, is revived and actively <br />pursued by the VILLAGE, he shall perform the balance of the services to be <br />rendered under this agreement and not previously performed, and he shall credit <br />against the total compensation due any payments made under Sec. 2c. <br />Sec. 2d. The fee provided in Sec. 2b hereof, shall cover engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.