My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013 010 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2013 Resolutions
>
2013 010 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:58:35 PM
Creation date
8/21/2018 7:24:51 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
010
Date
6/17/2013
Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? tNRfllFAif 100 RECA{L5L SEtSSR O:i1RICi <br />? REGONAL. <br />? $TORMYVATER <br />? MANqQEMENT <br />PROGRAM <br />?..? ......._..?__ . <br />Watershed Advisory Committee Policy <br />Febritary 12, 2013 <br />infrashucture improvements in each of the five watersheds. The Stormwater Construction Plan <br />is reviewed and updated annually. To be included as a project under the Stormwater <br />Construction Plan, projects must at a minimum meet the intent of the District's Regional <br />Stormwater Management Program and solve or mitigate regional stormwater problems. <br />The Stormwater Construction Flan undergoes an annual planning process that includes the <br />nominanon;of new projects;_and: validalion and__grioritizationof all::proposed construction. <br />projects. Facilitated by the Watershed Team Leader, the WACs engage in the Stormwater <br />Construction:Plan planning process, The WACs ate asked to provide the following: <br />1. Information for new construction projects to be considered for the Stormwater Construction <br />Plan. <br />2. New information on projects in the current Stormwater Construction Plan as it pertains to the <br />project scope, schedule, priority, permitting and substance. <br />3. Review of drafts of the Stonnwater Consttuction Plan and input on possible conflicts or <br />opportunities for implementation. The ]District developed an early-action Stormwater Construction Plan based on previous <br />stormwater studies such as tha Regioiial Plan for Sewerage and.Drainage - Phase 1 and the <br />Regional Intercommunity Drainage Evakiation Study. The early-action Stormwater Consiruction <br />Plan was also based an inspections; invesrigations and- Member Community meetings. These <br />early-acrion stormwater c.onstruction projects aze the focus of construction for the first years of <br />the Regional Stormwater Management Program and will connmence prior to the completion af <br />Stormwater Master Plans. In their first year, the WACs will be asked to review the current status <br />of the early-action Stormwater Consiruction Plan and to provide any additional input. <br />Secrion 2.3 - Inspection, Operation. Maintenance and Monitoring Activities <br />The District conducts inspections, operation, maintenance and monitoring activities on the <br />Regional Stormwater System and Districf owned and operated Stormwater Control Measures. <br />These acrivities include: <br />1. Preventative maintenance inspections of Stormwater Control Measures that fall under the <br />responsibility of the District and Distriet idenrified azeas of concem. <br />2. Inspections along the Regional Stormwater System to identify areas of maintenance, such as <br />stream bank erosion, and culvert or stream blockages with debris. <br />3. Operation and maintenance activities on Stormwater Control Measures and the Regional <br />Stormwater System. 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.