My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 029 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2004 Ordinances
>
2004 029 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:30 PM
Creation date
8/22/2018 5:19:59 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
029
Date
6/28/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> <br />Mayfield Village S.O.M. Center Road <br />Multicell Innerduct Modification <br />Probable Cost of Construction <br /> Quantity Contract Estimate Total <br />Item Ext. L.F. Cost Cost Cost <br />193 625 25920 Conduit ,Misc.: Conduit, 4" with 4 cell Innerduct, Type 713.07 300 $5.00 $5.50 $1,650.00 <br />S.O.M. Crossing at Wilson Mills Road <br />Sta. 55+74, 43' Lt. To Sta. 55+71.5, 36.5' Rt. (82 L.F.) <br />S.O.M. Crossing at Beta Drive <br />Sta. 85+12, 55.5' Lt. To Sta. 85+38,.39.5' Rt. (98 L.F.) <br />S.O.M. Crossing at Parkview Drive <br />Sta. 141+46, 76' Lt. To Sta. 141+35, 41.5' Rt. (120 L.F.) <br />Portion to be Jacked or Drilled Under Pavement (75 L.F.) <br />196 625 30706 Pull Box, 713.08, 24" 7 $710.00 $900.00 $6,300.00 <br />625 29000 Trench <br />SP625 Conduit Jacked or Drilled Under Pavement, 4" with 3-cell <br />Innerduct 713.04 of 713.07 Schedule 80 <br />225 $5.00 $5.50 $1,237.50 <br />75 $100.00 $7,500.00 <br />Total Probable Cost of Construction - $16,687.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.