My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 043 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2004 Ordinances
>
2004 043 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:36 PM
Creation date
8/22/2018 5:31:52 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
043
Date
9/27/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pressure falls below Customer's pressure. A fourth Check Valve shall be installed <br />in series with the Register Meter at the SOM Center Road/White Road <br />intersection, but manual opening of the isolation valves by Purveyor will be <br />required to allow water to flow through the Register Meters in accordance with <br />the processes set forth in Article II of City Contract No. 43125 between Purveyor <br />and Customer. <br />C. Purveyor shall own, maintain, and be in exclusive control of the <br />Meter, the Vault and the Check Valves, at the expense of Purveyor. <br />ARTICLE II. LIMITATION OF LIABILITY <br />Customer and Mayfield Village acknowledge and agree that <br />Purveyor shall not be liable for any losses incurred by Customer, Mayfield Village, <br />or any other party, resulting from the failure of the Check Valves or any other <br />hardware installed to implement this Agreement. Purveyor's liability to Customer <br />or Mayfield Village shall be determined solely by reference to the applicable <br />water service agreements between Purveyor and Customer and Mayfield Village. <br />ARTICLE III. PAYMENTS <br />A. Customer shall bill Purveyor for any water flowing through the Credit <br />Meter at the master meter rates established in Contract No. 43125 (Attached <br />hereto as Exhibit'~A"). Customer shall waive any and all fees related to <br />installation and/or operation of the Meter, including back-up or standby fees. <br />B. Purveyor shall compensate Customer for any water flowing through <br />the Credit Meter at the rates established in Contract No. 43125 by <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.